background image

Installation manual 

 

 
 

 

Apex 

In most cases, the apex is supplied in one piece (attention: in some house options, the apex can comprise 
several parts! In this case, these parts will have to be screwed together prior to other actions). Having installed 
the last wall logs, place the apex on the front and back walls and attach them with screws.  

The apexes have indents for the rafters. The rafters also have the corresponding indents, ensuring that the 
roof is placed firmly and in the right place. 

Now place the rafters in the 
corresponding indents in the 
apexes.  

Make sure that the upper wall log, 
apexes and rafters are level. Having 
fitted the rafters, screw them onto 
the apex from above. 

 

 Installation of rafters: 

 

 

ATTENTION

: If the wall logs are not properly pressed on top of one another without gaps, the upper wall log 

may not be on the same level with the apexes. In this case you should tap the wall logs downwards as 
necessary or plane the apex or sidewall log somewhat lower.  

 

Roof 

Before installing the roof boards, make sure that the house is completely level. Use the water-level to 
check all walls. 

ATTENTION

: When placing the roof, use a stable ladder. Do not step on the roof as the structure is 

suitable to sustain only an even load (snow, wind, etc.), and not a point load! 

Begin the installation of the roof boards 

from the front edge of the roof

. Tap the boards lightly and 

attach them from above and below with nails to the rafters and upper wall log.  

ATTENTION

: Do not press the roof boards together too densely and you will avoid moisture-causing 

bulging! Leave an interval of about 1 mm between the boards to allow for swelling. 

 

During the whole process of installing the roof boards, make sure that their crest rafters coincide 
and the eave sides of the boards extend at a uniform distance. Verify this with a rope or the lateral 
eave lath that you may install for verification purposes.  

 

The roof boards must be even with the rafter ends in front and behind. If necessary, saw both last 
roof boards so narrow that they are even with the rafter ends.  

Содержание FRF28-3832-3

Страница 1: ...dications ult rieures sont exclues Si une r clamation avait lieu veuillez respecter le d roulement suivant Il vous faudra pr senter votre commer ant sp cialis ce bulletin de contr le avec le r c piss...

Страница 2: ...Aankoopbewijs Datum Kaufbeleg Datum Date du r c piss Data prova d acquisto Fecha recibo Kvitteringsdato Kasse bons dato Forwarder Pick up Others Door Verzending Zelf afhalen Spedition Selbstabholer Pa...

Страница 3: ...e tekniske egenskaper ved produktet Alle rechten en technische wijzigingen voorbehouden Installation manual Montageanleitung Notice de montage Istruzioni per il montaggio Manual de montaje Monteringsa...

Страница 4: ...f the house We can only review complaints if you submit the control number of the house to the seller The warranty does not cover Peculiarities of wood as a natural material Wooden details already pai...

Страница 5: ...windows with a wood impregnation agent and do that namely both inside and outside Otherwise the doors and windows can become twisted After the house assembly is completed we recommend for the conclusi...

Страница 6: ...At the same time make sure that there are sufficient air apertures under the house floor for ventilation We recommend the following foundation options Strip or spot foundation Foundation from concrete...

Страница 7: ...rresponding materials are not included in the supplied kit Installation of foundation joists Walls When installing the walls it is important to remember that The logs are always assembled with their t...

Страница 8: ...eaves on the hinges now To open and close the door fit the separately packaged lock and handle Window installation Continue with the installation of the wall logs until you reach the window height The...

Страница 9: ...r plane the apex or sidewall log somewhat lower Roof Before installing the roof boards make sure that the house is completely level Use the water level to check all walls ATTENTION When placing the ro...

Страница 10: ...with the supplied felt nails at intervals of about 15 cm Make sure that the felt strips overlap by at least 10 cm Having installed the roof cover material attach the wind braces to the roof and the fa...

Страница 11: ...ry shorten the upper ends of the slats Do not turn the screws tightly so wood can further swell or diminish With the house having settled you should adjust the attachments so the wall logs can settle...

Страница 12: ......

Страница 13: ......

Страница 14: ......

Страница 15: ......

Страница 16: ......

Страница 17: ......

Страница 18: ......

Страница 19: ......

Страница 20: ......

Страница 21: ......

Отзывы: