background image

Inspection Certificate 

Controlecertificaat 

● Kontrollschein ● Bulletin de contrôle ●  Certificato di 

controllo  

● Certificado de control ● Kontrollskjema ● Kontrol Certifikat ● 

Tarkastustodistus 

● Besiktningsprotokoll ● Kontrolní certifikát ● Pārbaudes 

akts 

● Apžiūros pažyma ● Certyfikat kontrolny ● Certificado de Inspeção 

● Kontrollakt 
  

 

Please keep safely! 

Zorgvuldig te bewaren! 

● Bitte gut aufbewahren! ● A bien conserver, s.v.p.! ● 

Da conservare! 

● ¡A conservar! ● Ta vare på denne! ● Opbevares sikkert! ● 

Ole hyvä ja säilytä huolella! ● Vänligen förvara säkert! ● Prosím, pečlivě 
uschovejte! 

● Lūdzu, glabājiet drošā vietā! ● Laikykite saugiai! ● 

Prz

echowywać w bezpiecznym miejscu! ● Por favor, guarde em segurança!  

● Palun säilitada hoolsalt!   

 

          Art. Nr. FR28-2130-1 

 

 

English:

  The  product  you  have  purchased  was  manufactured  in  accordance  with  the  high  quality  norms.  The  product  unit  has  been 

carefully inspected and packed. In order to avoid possible problems during the assembly carried out by yourself or the building company of 
your choice, we recommend that you inspect the delivery for its completeness in accordance with the list of pieces before assembly. This 
inspection  must  be  carried  out  within  14  days  after  delivery  to  your  place.  W arranty  claims  are  limited  to  the  exchange  of  defective 
materials.  Defective  product  parts,  which  have  already  been  used  or  painted,  are  excluded  from  being  replaced.  All  further  claims  are 
excluded! In cases of complaints, please pay attention to the following procedures: Please present this inspection certificate along with the 
sales receipt to your place of purchase. Only in cases where these documents are presented will the complaint be dealt with quickly and 
without complications. 

Dutch

: Het door U gekochte product werd vervaardigd overeenkomstig hoge kwaliteitsnormen. Het product werd zorgvuldig gecontroleerd 

en  verpakt.  Om  tijdens  de montage, uitgevoerd  door  Uzelf of  een  door  U gekozen  aannemer,  problemen  te  vermijden,  raden  we  U a an, 
vóór de montage de levering te controleren op volledigheid in overeenstemming met de onderdelenlijst. Deze controle dient te gebeuren 
binnen 14 dagen na levering bij U thuis. Garantieclaims zijn beperkt tot het vervangen van defecte onderdelen. Defecte onderdelen die al 
gebruikt  of  geschilderd  zijn,  zijn  uitgesloten  van  vervanging.  Alle  latere  claims  zijn  uitgesloten!  In  geval  van  klachten  dient  u  als  volgt  te 
handelen:  Toon  dit  controlecertificaat,  samen  met  Uw  aankoopbewijs  aan  Uw  verkoper.  Alleen  wanneer  deze  documenten  getoond 
worden, zal de klacht snel en zonder complicaties in behandeling worden genomen.

 

Deutsch:

 

Der von Ihnen gekaufte Artikel wurde nach der hohen Qualitätsnorm gefertigt. Der Bausatz wurde sorgfältig geprüft und verpackt. 

Um  etwaige  auftretende  Pr

obleme  während  des  Aufbaus  durch  Sie  oder  Ihre  Aufbaufirma  zu  vermeiden,  kontrollieren  Sie  bitte  die 

Lieferung auf Vollständigkeit laut Stückliste vor dem Aufbau. Diese Kontrolle muss innerhalb 14 Tagen nach Anlieferung bei Ihnen erfolgen. 
Ansprüche auf Gewährleistung beschränken sich auf den Austausch von fehlerhaftem Material. Fehlerhafte Bauteile, die bereits verbaut 
oder  gestrichen  wurden,  sind  vom  Umtausch  ausgeschlossen.  Alle  weiteren  Ansprüche  sind  ausgeschlossen!  Sollte  es  zu  einer 
Beanstandung komm

en, beachten Sie folgende Vorgehensweise: Legen Sie Ihrem Fachhändler diesen Kontrollschein zusammen mit dem 

Einkaufsbeleg vor. Nur bei Vorlage dieser Unterlagen ist eine schnelle und problemlose Bearbeitung Ihrer Beanstandung möglich. 

Français:

 Le produi

t que vous venez d’acheter a été fabriqué en respectant de hautes normes de qualité. Ce produit a été testé et emballé 

avec soin. Afin d’éviter des problèmes éventuels pendant la construction par vous-même ou par la société de construction mandatée, nous 
v

ous  prions  de  bien  vouloir  vérifier  que  toutes  les  pièces  ont  été  fournies  selon  la  liste  des  pièces  avant  que  vous  ne  commenciez  la 

construction. Il vous incombe de faire ce contrôle dans les 14 jours après la fourniture. Les revendications en dédommagement se limitent 
à  l’échange  de  matériel  défectueux.  Les  pièces  défectueuses,  déjà  construites  ou  peintes,  ne  font  pas  l’objet  de  l’échange.  Toutes  les 
revendications  ultérieures  ne  sont  pas  prises  en  compte  ! En  cas  d’une  réclamation,  veuillez  respecter  le  déroulement  suivant  :  il  vous 
faudra présenter à votre commerçant agréé ce bulletin de contrôle avec le récépissé de l’achat. Ce ne sera que moyennant présentation de 
ces documents qu’un traitement rapide et sans problème de votre réclamation sera possible! 

Italiano:

 Il prodotto 

che avete acquistato è stata prodotta secondo la norma di alta qualità. Il kit è stato controllato ed imballato con cura. 

Per evitare eventuali inconvenienti durante il montaggio, si prega di verificare, prima del montaggio, la completezza della fornitura in base 
alla  distinta  dei  pezzi.  Tale  verifica  deve  essere  effettuata  entro  14  giorni  dalla  consegna.  Eventuali  diritti  di  garanzia  si  limitano  alla 
sostituzione di materiale difettoso. Gli elementi difettosi già montati o verniciati sono esclusi dal diritto alla sostituzione. Ogni altro diritto 
resta  escluso!  In  caso  di  reclamazione,  procedere  nel  modo  seguente:  presentare  questo  certificato  di  controllo  unitamente  alla  prova 
d’acquisto al rivenditore. Solo in questo modo la Sua reclamazione potrà essere evasa rapidamente e senza problemi. 

Español: 

El  producto  que  ha  adquirido  ha  sido  fabricada  de  acuerdo  con  normas  de  alta  calidad.  Las  piezas  del  producto  han  sido 

cuidadosamente  inspeccionadas  y  embaladas.  Con  el  fin  de  evitar  posibles  problemas  durante  el  montaje,  hecho  por  usted  o  por  la 
empresa  de  construcción  de  su  elección,  le  recomendamos  revisar  el  paquete  entregado,  con  la  lista  de  piezas,  antes  de  armar  el 
producto. Haga la revisión dentro de 14 días después de recibir el paquete. La garantía se limita a reemplazar las piezas defectuosas. No 
se reemplazarán las partes defectuosas que ya hayan sido utilizadas o pintadas. ¡No se aceptan otras reclamaciones! En casos de queja, 
por favor, presente este certificado junto con la factura en el lugar dond

e hizo la compra. Sólo presentando estos documentos podremos 

resolver su problema rápidamente y sin complicaciones. 

Norsk:

 

Produktet  du  har  kjøpt,  ble  produsert  i  henhold  til  høye  kvalitetskrav.  Produktet  har  blitt kontrollert  nøye  og  deretter  omhyggelig 

pakket.  For  å  unngå  mulige  problemer  under  monteringen,  uansett  om  du  gjør  det  selv  eller  får  en  godkjent  håndverker  til  å  gjøre  det, 
anbefaler vi at du kontrollerer leveransen mot delelisten for å se om alle delene er inkludert. Denne kontrollen må gjøres innen 14 dager 
etter at delene ble levert til din adresse. Garantikrav begrenser seg til bytte av defekte deler. Defekte elementer som allerede har blitt brukt 
eller malt/beiset/limt, vil ikke bli erstattet. Alle andre krav er utelukket! Dersom du har en 

reklamasjon, vennligst gjør som følger: Lever dette 

kontrollskjema  med  kvitteringen  til  salgsstedet.  Bare  når  du  har  med  disse  dokumentene  kan  klagen  behandles  raskt  og  uten 
komplikasjoner.

 

Dansk: 

Det købte produkt  fremstillet i overensstemmelse med de høje kvalitets krav. Produktet er blevet omhyggeligt inspiceret og pakket. 

For at undgå eventuelle problemer i løbet af monteringen udført af dig selv eller håndværker af dit eget valg, anbefaler vi, at du undersøger 
leverancen for fuldstændighed i overensstemmelse med listen over dele før samling. Denne inspektion skal foretages inden 14 dage efter 
levering til din plads. Garantikrav er begrænset til udveksling af defekte materialer. Defekte produkter, som allerede er brugt eller malet, er 
udelukket  fra  at 

blive  erstattet.  Alle  yderligere  krav  er  udelukket!  I  tilfælde  af klager,  skal du  være  opmærksom  på  følgende procedurer: 

Venligst  præsentere  denne  kontrol  certifikat  sammen  med  kvitteringen  til  det  sted  hvor  produktet  er  købt.  Kun  i  de  tilfælde,  hvor  disse 
dokumenter er forelagt kan klagen behandles hurtigt og uden komplikationer. 

Suomi:

  Ostamasi  tuote  on  valmistettu  korkeita  laatuvaatimuksia  noudattaen,  huolella  tarkastettu  ja  pakattu.  Jotta  pystytys  joko  itsesi  tai 

valitsemasi  rakennusliikkeen  toimesta  sujuisi  ongelmitta,  suosittelemme,  että  tarkistat  toimituksen  sisällön  osaluettelon  avulla  ennen 
kokoamisen  aloittamista.  Tämä  tarkistus  tulee  tehdä  14  päivän  kuluessa  toimituksesta.  Takuuvaateet  rajoittuvat  viallisten  materiaalien 
vaihtamiseen.  Viallisia  osia,  joita  on  jo  käytetty  ja  jotka  on  maalattu,  ei  vaihdeta  uusiin.  Lisävaatimuksia  ei  huomioida!  Mahdollisissa 
valitustapauksissa toimi seuraavasti: Esitä oheinen tarkastustodistus ja kassakuitti ostopaikassa. Valituksen nopea ja mutkaton  

Содержание FR28-2130-1

Страница 1: ...ompte En cas d une réclamation veuillez respecter le déroulement suivant il vous faudra présenter à votre commerçant agréé ce bulletin de contrôle avec le récépissé de l achat Ce ne sera que moyennant présentation de ces documents qu un traitement rapide et sans problème de votre réclamation sera possible Italiano Il prodotto che avete acquistato è stata prodotta secondo la norma di alta qualità I...

Страница 2: ...rodukto įsigijimo vietą turite pristatyti apžiūros pažymėjimą bei pirkimo kvitą Tik tais atvejais kai pristatomi minėti dokumentai pretenzija gali būti nagrinėjama greitai ir be komplikacijų Polski Produkt który Państwo zakupili wykonano według najwyższych norm jakości Elementy konstrukcyjne przed zapakowaniem przeszły dokładną kontrolę jakości Aby uniknąć problemów podczas samodzielnego montażu b...

Страница 3: ...dor Ostja aadress Telephone Telefoon Telefon Téléphone Teléfono Telefon Telefon nr Puhelin Telefon Telefon Tālrunis Telefonas Telefon Telefone Telefon Forwarder Pick up Others Door Verzending Zelf Afhalen Spedition Selbstabholer Par Transporteur Propres moyens Tramite Spedizioniere Mezzo proprio Entrega Transporte organizado transporte propio Transportør Sendes Hentes Transportør Sendes Hentes Rah...

Страница 4: ...ka förändringar för produkten Producent zastrzega sobie prawo do dokonywania zmian technicznych produktu Installation manual Montageanleitung Notice de montage Istruzioni per il montaggio Manual de montaje Monteringsanvisning Installatiegids Montážní návod Asennusohje Installationsmanual Instrukcja instalacji Log cabin FR28 2130 1 Blockhaus Maisonnette en poutres Casa di travi Casa de jardin Annek...

Страница 5: ...4 9 m2 186 276 210 320 ...

Страница 6: ......

Страница 7: ......

Страница 8: ......

Страница 9: ......

Страница 10: ......

Страница 11: ......

Страница 12: ......

Страница 13: ......

Страница 14: ...B 1850 2750 A A B EN Laying on concrete slabs not included FR Pose sur dalle béton non inclus ...

Страница 15: ... B EN Laying on concrete slabs not included FR Pose sur dalle béton non inclus EN Laying on wooden floor not included FR Pose sur plancher non inclus 001 001 AR1 001 008 AR1 Ø3 001 001 005 005 001 x2 005 x2 ...

Страница 16: ...Ø4x25 3 8 Ø4x25 a 4x Ø5x90 Ø5x90 Ø3 5x40 002 x7 004 x14 005 x14 TU28 57P x1 x4 Ø4x25 x16 Ø3 5x40 x2 Ø5x90 x8 002 005 005 004 004 1 2 ...

Страница 17: ...005 002 x8 004 x18 005 x16 004 004 005 002 ...

Страница 18: ...008 002 003 007 006 003 Ø5x90 Ø5x90 Ø5x90 Ø5x90 Ø5x90 Ø5x90 Ø5x90 PR1 PR1 PR1 Ø5x90 Ø5x90 PR1 002 003 006 007 008 x3 x1 PR1 PR1 PR1 003 003 WA 1 WB 1 Ø5x90 x20 x2 x2 x2 x2 1 2 ...

Страница 19: ...StB1 1 ca 80 ca 100 x8 x8 StB1 1 x2 M8x60 x8 1 2 StB1 2 x2 StB1 1 StB1 1 StB1 2 StB1 2 ...

Страница 20: ...RB1 1 x24 Ø2 5x50 x160 ...

Страница 21: ...1 2 3 4 ca 230 RE2 1 Ø3 5x40 a 6x YPapp 1 x1 RE1 1 x2 Ø3 5x40 x12 Ø2x16 x150 YPapp 1 x4 YPapp 1 1 2 ...

Страница 22: ...EaE2 1 x2 EaE2 2 x2 WB1 1 x2 Ø3 5x40 x46 EaE2 2 Ø3 5x40 a 10x EaE2 1 Ø3 5x40 a 8x WB1 1 Ø3 5x40 a 5x EaE2 1 Ø3 5x40 a 6x 1 2 3 1 2 ...

Страница 23: ...ca 5mm ca 4mm ca 150mm ca 5mm Ø4x50 Ø3 5x25 150 Ø8 15mm Ø2 5x16 Ø8 15mm Ø3x30 x5 SiS6 1 Ø3x30 x5 30 x1 SiS6 1 TU28 57P Ø3 5x25 x1 x2 x1 Ø4x50 x12 x1 x4 Ø2 5x16 x2 Ø3x16 x8 Ø3x30 x10 Ø3x16 1 2 x16 ...

Страница 24: ... of the house We can only review complaints if you submit the control number of the house to the seller The warranty does not cover Peculiarities of wood as a natural material Wooden details already painted processed with a wood preservative Wooden details containing whole branches that do not endanger the stability of the house Colour tone variations caused by wood structure differences that do n...

Страница 25: ... windows with a wood impregnation agent and do that namely both inside and outside Otherwise the doors and windows can become twisted After the house assembly is completed we recommend for the conclusive finishing a weather protection paint that will protect wood from moisture and UV radiation When painting use high quality tools and paints follow the paint application manual and manufacturer s sa...

Страница 26: ...ation so that its upper edge extends from the ground to a height of at least 5 cm At the same time make sure that there are sufficient air apertures under the house floor for ventilation We recommend the following foundation options Strip or spot foundation Foundation from concrete or pavement slabs Cast concrete bed Prepare the foundation so that the foundation joists are propped up on every side...

Страница 27: ...orresponding materials are not included in the supplied kit Installation of foundation joists Walls When installing the walls it is important to remember that The logs are always assembled with their tongue upwards If necessary use the hitting block and hammer Never directly hit the tongue with the hammer Install the walls in accordance with the appended wall plans see Technical specifications Fir...

Страница 28: ... supplied already assembled Doorframe installation Only necessary for a double door Door installation The doorframe is placed at the formed aperture and pushed with force onto the lower log If it is a double door place the leaves on the hinges now To open and close the door fit the separately packaged lock and handle Window installation Continue with the installation of the wall logs until you rea...

Страница 29: ...ns ATTENTION If the wall logs are not properly pressed on top of one another without gaps the upper wall log may not be on the same level with the apexes In this case you should tap the wall logs downwards as necessary or plane the apex or sidewall log somewhat lower Roof Before installing the roof boards make sure that the house is completely level Use the water level to check all walls ATTENTION...

Страница 30: ...ake sure that the felt strips overlap by at least 10 cm Floor Only when the house is built completely you can install the floor boards thus avoiding unnecessary smudging on the floor Place the floor boards on the base frame tap them lightly against one another and then nail them with force to the foundation joists If necessary cut the last floor board to the suitable width The final operation is t...

Страница 31: ...ld adjust the attachments so the wall logs can settle Installation of storm braces General advice Problem Gaps appear between the wall logs Cause Additional details are attached to the house that do not allow wood to swell diminish Solutions If the door window is attached to the wall logs with screws nails remove these screws nails If the storm brace is screwed on too tightly loosen its attachment...

Страница 32: ...trollnummer des Hauses Es ist möglich die Reklamation nur dann als Garantiefall zu behandeln wenn Sie die Kontrollnummer Ihrem Fachhändler weitergeben Abweichungen die keinen Reklamationsgrund darstellen Holz ist ein Naturprodukt daher gehören die naturgegebenen Beanstandungen nicht unter Garantie Materialreklamationen werden nicht akzeptiert wenn bereits ein Anstrich erfolgte Äste die mit dem Hol...

Страница 33: ...r wichtig sowohl die Innen als auch die Aussenseiten der Türen und Fenster auf einmal zu streichen Andernfalls können sie sich verziehen Nach dem Aufbau empfehlen wir Ihnen die Aussenhaut ohne Dach zu Grundieren sobald diese trocken ist sollten Sie das Haus mit einer Holzlasur streichen die das Holz vor Feuchtigkeit und UV Strahlung schützt Beim Anstrich benutzen Sie hochwertiges Werkzeug und Farb...

Страница 34: ...s Hauses später ausreichend unterlüftet wird Wir machen folgende Fundamentvorschläge Streifen oder Punktfundament Beton bzw Gehwegplattenfundament geschüttetes Betonfundament Bereiten Sie das Fundament so vor dass die Lagerhölzer überall im Abstand von max 50 60 cm gestützt sind Lassen Sie sich ggf von einem Fachmann beraten bzw lassen Sie das Fundament von einem Fachmann erstellen III Aufbau WICH...

Страница 35: ...Die Wandbohlen werden immer mit der Feder nach oben zeigend zusammengesteckt Beim Bedarf benutzen Sie das Schlagholz und den Hammer Nie mit dem Hammer direkt auf die Feder schlagen Die Wandpläne Siehe Technische Daten zeigen Ihnen den Aufbau der Wände Als erstes verlegen Sie die halben Bohlen der Vorder und Rückwand und befestigen Sie sie mit Schrauben an die Lagerhölzer Danach legen Sie die Seite...

Страница 36: ...enmontiert Montage der Türrahmen Nur bei Doppeltür nötig Montage der Tür Der Rahmen wird von oben in die entstandene Öffnung geschoben und fest auf die unterste Bohle gedrückt Bei einem Haus mit Doppeltür hängen Sie nun die Türblätter ein Montieren Sie nun die separat verpackten Türgriffe so dass Sie die Tür öffnen können Montage der Fenster Fahren Sie fort die Wände hochzuziehen bis Sie zur Fenst...

Страница 37: ...Oberseiten der Pfetten mit dem Giebel nicht bündig abschliessen sollten Sie entsprechend die Wandbohlen nach unten klopfen oder den Giebel bzw die Seitenwandbohle etwas nachhobeln Dach Vor dem Verlegen der Dachbretter ist darauf zu achten dass das Haus hundertprozentig in Waage steht Überprüfen Sie mittels einer Wasserwaage alle 4 Seitenwände WICHTIG Der Dachbelag darf nur über eine standfeste Lei...

Страница 38: ... bei der Anbringung der nächsten Lagen dass diese mindestens 10 cm über die vorherige Lage überlappen Nach dem Einlegen der Dachpappe erfolgt die Montage der Windbretter und die Befestigung der Giebelblenden an die Pfetten und obersten Wandbohlen Montage der Windbretter und Giebelblenden Fussboden Erst wenn das Haus komplett aufgebaut wurde erfolgt das verlegen der Fussbodenbretter dadurch vermeid...

Страница 39: ...n Sie die Leisten von der oberen Seite kürzer Die Schlossschrauben dürfen nur Handfest angezogen werden damit das Holz weiterhin arbeiten kann Wenn das Haus sich gesetzt hat müssen die Befestigungen reguliert werden damit die Wandbohlen sich nach unten setzen könnten Montage der Sturmleisten Allgemeine Tipps Problem Es entstehen Spalten zwischen den Bohlen Ursache Es sind zusätzliche Details an de...

Страница 40: ...ion ne peut être traitée dans le cadre de la garantie que si vous communiquez le numéro de contrôle à votre revendeur spécialisé Ecarts qui ne constituent pas un motif de réclamation Le bois est un produit naturel ce qui fait que les réclamations reposant sur des phénomènes naturels ne tombent pas sous le coup de la garantie Les réclamations concernant les matériaux ne sont pas acceptées si une pe...

Страница 41: ... est très important de peindre en une seule fois aussi bien les faces intérieures que les faces extérieures des portes et des fenêtres Dans le cas contraire elles pourront se déformer Une fois le montage effectué nous vous conseillons de revêtir l extérieur sans le toit d un apprêt Dès que cet apprêt sera sec vous devrez revêtir votre maison d un glacis pour bois qui protégera le bois contre l hum...

Страница 42: ...proposons les fondations suivantes Semelle filante ou fondations ponctuelles Fondations en béton ou fondations en dalles de ciment Fondations coulées en béton Préparez les fondations de façon à ce que les longrines prennent partout appui à un écartement de max 50 60 cm Faites vous le cas échéant conseiller par un spécialiste ou faites réaliser les fondations par un spécialiste III Montage IMPORTAN...

Страница 43: ...t avec le marteau Les plans des parois voir partie Caractéristiques techniques vous montrent le montage des parois En premier posez les demi madriers de la paroi avant et de la paroi arrière et fixez les à l aide de vis sur les longrines Placez ensuite les madriers des parois latérales dans leur position A cet égard veillez à ce que la première couronne de madriers soit un peu au dessus des longri...

Страница 44: ... la porte emballées séparément de façon à ce que vous puissiez ouvrir la porte Montage des fenêtres Continuez à monter les parois jusqu à ce que vous arriviez à la hauteur des fenêtres Les plans des parois voir Caractéristiques techniques vous indiquent combien il y a de madriers sous les fenêtres Pour poser les fenêtres procédez exactement comme pour la porte Introduisez le châssis de la fenêtre ...

Страница 45: ...sser ou bien raboter un peu plus le pignon et le madrier de la paroi latérale Toit Avant la pose des planches du toit il convient de veiller à ce que la maison soit à cent pour cent de niveau A l aide d un niveau à bulle d air vérifiez les 4 parois latérales IMPORTANT Le revêtement du toit ne doit être mis en place que par utilisation d une échelle stable Il ne faut pas marcher sur le toit car sa ...

Страница 46: ...es pour carton bitumé en respectant un espacement de 15 cm environ Lors de la mise en place des couches suivantes veillez à ce que celles ci recouvrent la couche précédente sur 10 cm au moins Après la pose du carton bitumé viennent le montage des pare vent et la fixation der bandeaux de pignon sur les pannes et les madriers de parois supérieurs Montage des pare vent et des bandeaux de pignon Planc...

Страница 47: ... cas de besoin raccourcissez les baguettes du côté supérieur Les vis à tête bombée et collet carré ne doivent être serrées qu à la main afin que le bois puisse continuer à travailler Une fois que la maison s est bien mise en place il faut ajuster les fixations afin que les madriers des parois puissent s abaisser pour se mettre en place Montage des contreventements Conseils Problème Des fentes se f...

Отзывы: