background image

 

Larisch 

98-572_99-04_00-03.doc 

K7957, 17.11.2009 

4. Installing the electrical system

 

1. 

Use the corresponding 

MBB

 circuit diagram accommodated in the sealing cap on the right-hand side 

(direction of travel) and observe the vehicle manufacturer's assembly instructions. 

2. 

Run the battery cable to the battery, shorten it if required and connect the cable lug. 

3. 

Assemble the main fuse with the cable lug and connect it to the battery positive terminal. 

4. 

Run the control box cable to the driver's cab, select the appropriate place at the instrument panel, 
establish an electrical connection according to the 

MBB

 circuit diagram and attach the control box. 

5. 

If a control box is already present in the vehicle, connect the 

MBB

 tail lift according to the additional 

MBB

 circuit diagram. If required, order this circuit diagram from 

MBB

 
 
 
 
 
 
 
 

6. 

Establish a ground connection according to the vehicle manufacturer's assembly instructions. 

7. 

NOTICE!

 For DGRTR vehicles, connect the ground cable to the battery or according to the vehicle 

manufacturer's assembly instructions. 

8. 

Fasten the operating panel with screws or weld it acc. to the 

MBB

 assembly drawing. 

9. 

When installing the hand cable control, observe the following:

 Install the cable with terminal box 

under the truck platform in such a way that the cable can be connected to the hand cable control 
from there. Connect the hand cable control cable to the terminal box as specified in the 

MBB

 circuit 

diagram. Select a suitable and safe accommodation for the hand cable control. 

10. 

The hand cable control may be operated from the marked position on the platform, only.

 

6. Mounting and adjusting the tilt cylinder 

 

1. 

Remove the screw plug of the oil reservoir and replace it with the attached air filter (if existing). 

2. 

Turn both rod heads of the tilt cylinders until reaching the piston rod stop. Actuate the Fold in and 
Fold out rotary switches to set the tilt cylinder to a length that allows you to connect the cylinders to 
the tailboard using bolts.  

Note!

 First bolt only one cylinder to the tailboard. 

3. 

Move up the lifting device using the lift cylinders until reaching the top end stop and dismount the 
auxiliary unit.  

4. 

Attach the tilt sensor to the platform as shown.  

5. 

Lower the platform until reaching the ground, fold the platform head and then raise the platform 
package with the bolted cylinder to such an extent that the extended tilt cylinder gets in contact with 
the inner stop.  
Turn the tilt cylinder's piston rod using a spanner until the platform is at an angle of around 75° to 
the ground. Then tighten it with a counter nut towards the rod head.  
Also move the other tilt cylinder to the inner stop and turn its piston rod to allow for bolting it. Secure 
the rod head using a counter nut. 

6. 

Swivel down and raise again the platform package several times.  If the lifting device should be lifted 
when raising, evenly turn in the piston rods into the rod head.  
This reduces the angle between the platform and the ground and, thus, the tilt angle for lifting the 
lifting device.  

7. 

Tighten the counter nut and mount the bellows. 

8. 

Attach the end position switches to the vehicle chassis frame in such a way that the pilot lamps of 
the control box are off when the platform is in the vehicle driving position.  

5. Adjusting and mounting prior to commissioning

 

1. 

Raise the platform until reaching the stop. 

2. 

Take the three connectors for the foot control (not with Basic) and Warnfix out of the platform, 
connect them to the connectors coming from the lift arm (yellow cable binders with yellow cable, 
black with black and connector marked with white cable binders), return the connectors connected in 
this way to the platform and install the strain relief. 

3. 

Securely fasten the cables to the lift arm using cable binders. Make sure that the platform can move 
freely, provide sufficient cable length. 

4. 

Make sure that all installed cables have been laid thoroughly and fastened reliably. Observe the 
required bending lengths. 

5. 

Lower the platform until reaching a level of approx. 250 mm above ground and set the switch b13 at 
the right lift arm to its horizontal position. For this purpose, undo the switch fastening screw, re-
tighten it after the setup and fold back the locking plate. 

 
 
 
 
 
 
 
 
 
 
 
 
6. 

Lift, lower, fold in and fold out the platform several times in order to deaerate the cylinders. 

7. 

Check the oil level with lowered platform and check that all screw connections made according to the 

MBB 

assembly drawing are tight. Perform an acceptance test according to the 

MBB

 test data 

booklet and record the test results in the test data booklet. 

 

Control box for 
motor vehicles 

Control box for 
semitrailers or 
trailers 

Main fuse 

Strain relief 

Plug for foot 
control and Warnfix 

Switch b13 
Locking plate 
horizontal 

Install sensor b15 in this way 

Spanner flat for spanner 

Tilt cylinder 

Counter nut 

Rod head 

Отзывы: