Palfinger MBB C 500 VAN Скачать руководство пользователя страница 2

 

Larisch 

13-513_99-04_00-03 

A23676, 06/06/19 

PALFINGER Tail Lifts GmbH

 | Fockestraße 53 | D-

27777 Ganderkesee | T + 49 4221 853-0 | [email protected] | www.palfinger.com 

3. Installation of electrics 

 

1.  Refer to the corresponding C 500 VAN circuit diagram (see the Operating Instruction Manual 

provided) and follow the vehicle manufacturer's assembly instructions. 

2.  Run the battery cable to the battery, shorten it if required and install the cable lug 
3.  Assemble the main fuse with the cable lug and connect it to the battery positive terminal. 
4.  Lay the controller cable through to the driver's cab. In the driver's cab, select the appropriate place 

at the instrument panel, establish an electrical connection according to the C 500 VAN circuit 
diagram and attach the control box. 

5.  If a control box already exists in the vehicle, connect the C 500 VAN according to the additional 

circuit diagram. If necessary, order this circuit diagram from PALFINGER Tail Lifts. 

6.  Establish a ground connection according to the vehicle manufacturer's assembly instructions 

           

 

 

                 Control unit for                      Control unit for 
                 motor vehicle                        semitrailer and trailer

 

 

7. 

CAUTION!

 For DGRTR vehicles, connect the ground cable to the battery or according to the vehicle 

manufacturer's assembly instructions. 

8. 

The hand cable control may be operated from the marked position on the platform, only. 

 

4. Assembly and adjustment - tilt cylinder 

 

1.  Turn the tilt cylinder's rod head until reaching the piston rod stop. Actuate the Open or Close control 

switch to set the tilt cylinder to a length that allows you to bolt the cylinder to the platform. For this 
purpose, hold down the tilt sensor b15/b16 with the cable. Pin platform with the tilt cylinder, secure 
with the tab and secure with M12 screw. Tighten this to a torque of 75Nm. 

2.  Move the lifting device up to the height stop using the lifting cylinder. If required, remove the 

auxiliary unit. 

3.  Attach the tilt sensor b15/b16, as seen in the diagram, to the dedicated platform strap on the right-

hand side so that the potting compound is oriented towards the outside. 

4.  Unscrew the drawbar nuts as far as possible. 
5.  Close the platform towards the vehicle body as far as possible (fully extend the tilt cylinder),  

release the tilt cylinder by briefly actuating the "Open" pushbutton switch  
and turn the piston rod 
using an open ended wrench to close the 
platform as far as possible until it is approx. 
5cm from the vehicle body (doors).                                                

NOTE!

 In this platform position 

the tilt cylinder must be fully extended 
to the stop. 

CAUTION!

 The platform must not come in 

contact with the vehicle body, which 
may otherwise be damaged. 

6.  De-pressurise the tilt cylinder by opening the platform 

and fasten the piston rod counter nut according 
to the assembly drawing. 

 

5. Adjusting the drawbar 

 

1. 

Lift the platform up fully to the top. 

2. 

Close the platform to the desired vertical position. 

3. 

Turn the nut and counter nut to the stop and tighten to approx. 50Nm. 

4. 

Tighten the counter nut.

 

 

 

 

 
                                             

Drawbar 

                                       Stop 
                   Nut/counter nut 

6. Adjustment and installation work prior to commissioning 

 

1.  Loosen the strain relief (plastic cap at the platform head profile). Pull the cable with the connector plug 

for the foot control and Warnfix out of the platform (make sure that the cable length is sufficient) and then 
reinstall the strain relief. Run the cable along the hydraulic hoses to the hydraulic unit. Use cable binders. 
Connect the plug to the appropriate receptacle on the PCB according to the circuit diagram. Insert the 
cable through the entry into the hydraulic unit housing and position the protection sleeve. Close the 
hydraulic unit. 

2.  Close the platform to the body. 

 

 
 
 
 
 
 
 
 

 

3.  All cables installed must be carefully laid and securely fastened. Sufficient bending lengths must be 

observed. 

4.  Lower the platform until reaching a level of approx. 250 mm above ground and set the switch b13 at the 

torsion frame to its horizontal position. For this purpose, undo the switch fastening screw, re-tighten it 
after the setup and fold back the locking plate. 

5.  Lift, lower, open and close the platform several times in order to bleed the cylinder. If required, adjust the 

platform's horizontal position on the ground by turning the tilt sensor b16 accordingly. 

6.  Check the oil level with lowered platform and check that all screw connections established according to 

the assembly drawing are tight. Perform an acceptance test according to the test data booklet and record 
the test results in the test data booklet. 

 

 

Main fuse 

Strain relief 

Switch b13 
horizontal 

Connector for foot 
control and Warnfix 

Counter nut 

Rod head 

Detail Z 

Tilt sensor b15/b16 

Detail X 

Detail X 

Отзывы: