ILF 33/44/55 Installation Manual
Rev 1.1
40
Main Power Connections
9.4
2GA. Liftgate
Power Cable
Aux.
Batteries
Liftgate
Mount Frame
Resetable
Circuit
Breaker
*In-Line
Fuse
Wires #2 and #4
go to postitive (+)
4-Conductor Control
Power Cable
from Control Board
***Ground
Wires #1 and Gr/Yl
go to ground (-)
Control Board
Location (Inside)
2GA. Liftgate
Power Cable
Main
Batteries
Liftgate
Mount Frame
**Resetable
Circuit
Breaker
*In-Line
Fuse
Wires #2 and #4
go to postitive (+)
4-Conductor Control
Power Cable
from Control Board
Wires #1 and Gr/Yl
go to ground (-)
Control Board
Location (Inside)
Ground
Battery Wiring Setup
– Truck
Battery Wiring Setup - Trailer
*In-Line ATC Fuse: 20 Amp.
Replace with same amperage fuse when necessary.
**Resettable Circuit Breaker: 150 Amp Min.
Replace with same amperage breaker when necessary.
***Ground: For optimal grounding, ground all batteries and power units to the body side rails of the vehicle.
NOTICE: DO NOT attempt to jump in-line fuses with other objects other than the specified fuse.
Do not increase the amperage rating of fuse. Serious harm to the liftgate will result when standard practices are not followed.