
6
6
WK-2-C installation with optional pre-construction bracket
Pre-construction bracket sold separately.
1
Place the pre-construction bracket against the bottom of the ceiling studs at the desired
mounting location.
2
Mark locations for mounting screws. Drill 1/16” pilot holes at marked locations. Secure the
pre-construction bracket to ceiling studs using the provided hardware.
3
Install sheet rock over pre-construction bracket. Make note of where the cutout on the pre-
construction bracket is when installing the drywall.
4
Cut an opening in sheet rock using the cutout on the pre-construction bracket as a guide.
Note:
The Pakedge logo should be facing outwards.