PG-Flex System Overview
12
Metallic Bypass Pair
As shown in Figure 8, a third pair may be used between the remote terminal and central office
terminal to provide a metallic test path from the central office test equipment to a selected
subscriber drop.
Figure 8. Metallic Test Access Through COT Channel Unit
When testing subscriber drops through the metallic bypass pair, the length and quality of the bypass
pair must be taken into consideration when analyzing the measurement results.
Only one subscriber circuit in a PG-Flex shelf can be accessed at a time when an FPI-729 List 1 or
an FAU-728 List 2 is installed.
If an FAU-728 List 1 is installed, one subscriber circuit in each PG-Flex system can be accessed
simultaneously.
Содержание PG-Flex
Страница 10: ...PG Flex System Overview 2 Figure 1 Typical PG Flex Configuration 23 Shelf shown ...
Страница 24: ...PG Flex System Overview 16 ...
Страница 44: ...Installing PG Flex System Hardware 36 Figure 16 Line Unit and Channel Unit Installation Locations ...
Страница 52: ...Installing PG Flex System Hardware 44 Figure 21 Connecting the Metallic Bypass Pair ...
Страница 62: ...Installing PG Flex System Hardware 54 ...
Страница 66: ...Terminal Management 58 Figure 28 Connecting an ASCII Terminal to a Line Unit ...
Страница 104: ...Performance Monitoring 96 ...
Страница 120: ...Troubleshooting 112 ...
Страница 158: ...Screen Menus and Definitions A 36 ...
Страница 162: ...Acronyms and Glossary Glossary 4 ...
Страница 167: ......
Страница 168: ......