background image

 

Installation Steps: BE SURE TO REFER TO THE INSTALLATION SCHEMATIC

 

IN ADDTION TO  

 

 

          READING THE FOLLOWING STEP-BY-STEP INSTRUCTIONS. 

 

 

DISCONNECT MAIN BATTERY BEFORE INSTALLING! 

 

 

 

1.  Start by mounting the Digital Power Manager and Jump Start solenoid a safe 

distance away from any moving parts or hot spots under the hood; meaning keep 
the unit at least 3 feet away from headers or exhaust manifolds and away from any 
engine belts or hood hinges. 
 

2.  This kit includes 10 feet of 6ga red wire to allow mounting the DPM on either side of 

the vehicle. Most of the time, it’s best to mount the unit as close to the MAIN battery 
as possible. 

(THE MAIN BATTERY IS YOUR VEHICLE’S ORIGINAL BATTERY.)  

 

3.  Once a flat mounting spot has been located, accurately mark the two mounting holes 

and drill them with a 13/64

” drill bit.  

 

4.  Now carefully insert each of the provided 10-

32 / ¾” screws through the two 

mounting holes on the DPM and the previously drilled holes in the desired mounting 
location and fasten them with the provided 10-32 Nylon Lock Nuts. Be sure the DPM 
is mounted to a flat location as to not put a twist in the DPM’s plastic housing. 
 

5.  Next find the provided ¼-20 bolts, nuts, lock washers and flat washers. These will be 

used to mount the 250 amp solenoid very close to the DPM. First, loosely install the 
two red 6 gauge wires with ring terminals and then carefully determine where to 
mount the 250 amp solenoid. Accurately mark the two mounting hole locations and 
drill them with a ¼” drill bit. Install and tighten the ¼” fasteners on the solenoid. 
   

6.  Next remove all of the nuts and lock washers from the unit and install the wires as 

displayed on the Installation Schematic on page 4. Be sure to mark and carefully drill 
the two ¼” holes for the Jump Start solenoid after connecting the two pre-made red 
6 gauge cables to connect the solenoid to the DPM unit. These wires a

re 10” and 13” 

long and must be connected correctly. Failure to carefully read these instructions 
and follow them may result in a catastrophic failure. BE CAREFUL, the amperages 
available from the battery can easily start a fire when connected improperly.  
 

7.  Next cut the two 5ft. long red 6ga wires to length and connect the MB 6ga red wire to 

the Main battery positive post and to connect the RB 6ga red wire to the Reserve 
battery positive post. Crimp on one of the 

provided 5/16” cable lugs to each of the 

ends and apply one of the provided pieces of red shrink tube to each.  
 

8.  Now connect these wires to the original battery posts 

5/16” clamp bolt. If your 

vehicle has a side post battery it will be necessary for you to either purchase a four 
post battery with both side and top posts or to go to your local auto parts dealer and 
pickup two adaptor battery ends. 

 
 

 

Содержание 40121

Страница 1: ...t Perfect Performance Products LLC Painless Performance Products Division 2501 Ludelle Street Fort Worth TX 76105 1036 800 423 9696 phone 817 244 4024 fax Web Site www painlessperformance com E Mail t...

Страница 2: ...ss Perfect Performance Products LLC shall in no event be liable in contract or tort including negligence for special indirect incidental or consequential damages such as but not limited to loss of pro...

Страница 3: ...ary battery will be charged based on the charge level of the Main battery This means the Main battery voltage must reach 12 6 volts before the Auxiliary battery will be allowed to charge The DPM w Jum...

Страница 4: ...4...

Страница 5: ...the DPM First loosely install the two red 6 gauge wires with ring terminals and then carefully determine where to mount the 250 amp solenoid Accurately mark the two mounting hole locations and drill t...

Страница 6: ...the vehicle using the provided ring terminal 10 star washer and black self tap screw 14 Connect the red 18 gauge wire with the 5 16 ring terminal on it and the fuse holder to the MB post with the 10...

Страница 7: ...Reserve Battery Things to keep in mind It is not a good idea to always have to use this jump start option to start your vehicle because of a faulty Main Battery MB If your Main Battery is weak or faul...

Страница 8: ...the battery for a short period of time after charging that often causes confusion as to the battery s charge level 4 Surface charge is normally experienced directly after a battery charger is disconn...

Страница 9: ...purchaser to be free from defects in material and workmanship under normal use Painless Performance will repair or replace defective products without charge during the first 12 months from the purcha...

Отзывы: