Label the battery connection cables as a plus cable (A+) and a
minus cable (A-).
Lay the battery cables in parallel between the solar charge controller and the
battery.
Connect the battery connection cable with the correct polarity to the middle
pair of terminals on the solar charge controller (with the battery symbol).
If necessary, remove any external fuse.
Connect battery connection cable A+ to the positive pole of the battery.
Connect battery connection cable A- to the negative pole of the battery.
Replace the external fuse in the battery connection cable.
If the polarity connection is correct, the battery LED illuminates.
1st step: Connect the battery
2nd step: Connect the solar module
Ensure that the solar module is protected from incident light.
Ensure that the solar module does not exceed the maximum
permissible input current.
Label the solar module connection cables as a plus cable (M+) and a minus
cable (M-).
Lay both solar module connection cables in parallel between the solar module
and the solar charge controller.
First connect the M+ solar module connection cable to the correct pole of the
left pair of terminals on the solar charge controller (with the solar modules
symbol),then connect the M- cable.
Remove the covering from the solar module.
3rd step: Connect loads
Notes
●
Connect loads that must not be deactivated by the solar charge
controller deep discharge protection, e.g. emergency lights or
radio connection, directly to the battery.
●
Loads with a higher current consumption than the device output can be
directly connected to the battery. However, the solar charge controller deep
discharge protection will no longer intervene. Loads connected in this manner
must also be separately fused.
Label the load connection cables as a plus cable (L+) and a minus cable (L-).
Lay the load connection cables in parallel between the solar charge controller
and the load.
First connect the L+ load cable to the correct pole of the right pair of terminals
on the solar charge controller (with the lamp symbol), then connect the L- cable.
Replace the load fuse or switch on the load.
4th step: Final work
Fasten all cables with strain relief in the direct vicinity of the solar charge
controller (clearance of approx .10cm).