
(Follow step B if you are upgrading the load capacity of PackshotOne Mark II from 20 kg to 50 kg)
Packshot
One
Mark II
HARDWARE INSTALLATION
(OPTIONAL) ADDITIONAL BOTTOM GLASS INSTALLATION
STEP B
1/2:
01
02
Follow the steps
a-g
in the
Step
A
to place the bottom glass and
the acrylic diffusion plate. Remove
the white hand screws and take o
the top.
Place an acrylic tube on each hole
where the top connects to the light
box.
04
05
Put the top back on with hand
screws going thru the acrylic tubes.
Slide in the large acrylic panels
from the front.
03
There are 6 hole in total.