11
FM-20ORB & FM-28ORB FLOOR MACHINES - WIRING DIAGRAM
MAINTENANCE SCHEDULE FOR SERVICE
MAINTENANCE
DAILY
WEEKLY
ANNUALLY
Check power cord for damage. Do not operate unit if damage is found
X
Check grip face of pad driver to inspect for wear or debris. Replace if
needed
X
If equipped with dust control option, check vacuum hose and cuffs for
damage or wear
X
After operating, wipe machine down with a damp cloth to remove dust and
debris
X
Make sure pad is on pad driver at all times, even during transport and stor-
age
X
Clean off the motor and the base of the machine with a vacuum to prevent
dust build-up
X
Replace all of the isolators
X
Replace the bearing assembly
X
These maintenance procedures must be performed with the machine off and unplugged from a wall outlet. Make sure to read all safety
instructions prior to performing maintenance.
Содержание 545411
Страница 13: ...13 FM 20ORB FLOOR MACHINE BASE ASSEMBLY ...
Страница 14: ...14 FM 28ORB FLOOR MACHINE BASE ASSEMBLY ...
Страница 15: ...15 FM 20ORB FLOOR MACHINE PLATE ASSEMBLY ...
Страница 16: ...16 FM 28ORB FLOOR MACHINE PLATE ASSEMBLY ...
Страница 17: ...17 FM 20ORB FM 28ORB HANDLE ASSEMBLY ...
Страница 18: ...18 FM 20ORB FLOOR MACHINE WEIGHT ASSEMBLY OPTIONAL ...
Страница 19: ...19 FM 28ORB FLOOR MACHINE WEIGHT ASSEMBLY OPTIONAL ...
Страница 20: ...20 FM 20ORB FM 28ORB FLOOR MACHINES DUST CONTROL ASSEMBLY OPTIONAL ...
Страница 21: ...21 FM 20ORB FM 28ORB FLOOR MACHINES VACUUM OPTIONAL DUST CONTROL KIT ...
Страница 22: ...22 FM 20ORB FM 28ORB FLOOR MACHINES SOLUTION TANK ASSEMBLY OPTIONAL ...