AFX SERIES® OPERATION MANUAL
SECTION 5: UNPACKING AND INSTALLATION
Entire Contents Copyright
2018 by Pacific Power Source, Inc. (PPS) • All Rights Reserved • No reproduction without written authorization from PPS.
AFX Series Power Source Operation Manual
Page 62 of 485
5.14.2
Three Phase Wye Load Output Connection
Connection of a three-phase load requires the mating connector provided in the AFX Series®
ship kit. This six-pole connector uses a spring loaded wire attachment system. To unlock a
position, use a small screwdriver or pin to push down in the square hole located directly
above each connection. Once you push in, you will feel to spring unlatch. Now push the
stripped wire end into the connector and pull out the small screwdriver or pin. This will
release the spring locking down the wire. Use a pull test to make sure the wire is clamped
down securely.
Repeat for the three phase wires and the neutral wire. Note that the three neutral positions
on the rear panel output power connector are all shorted together inside the AFX. Thus,
there is only one neutral, which is common for all output phases. For balanced three phase
Wye loads, only one of these three neutral output positions has to be connected to the
load’s neutral position.
Содержание AFX Series
Страница 484: ......