background image

220206-20

SUPER-SD1

7

FIG. #2

Chimney

Roof flashing

Storm collar

* 4" diameter air inlet with rodent screen
* If the crawl space is well ventilated it is
not necessary to extend air inlet to outside

Spark arrestor
rain cap

Radiation shield

Chimney Connector

Chimney Support

56" (1422 mm)

Minimum

Minimum 7' (2.1m.)

Ceiling Height

Attachment to floor for
mobile homes

Non-combustible
floor protector

48"

(1219 mm)

3' (914 mm)

Minimum

Hooded vent or
90 elbow turned down

The chimney may incorpo-
rate an offset.  To do this
safely, all sections of listed
connector, offset elbows
and chimney section must
be screwed together by at
least three sheet metal
screws per joint.  The
chimney must be suitably
supported by the chimney
manufacturer's listed offset
support.

Listed Chimney and Chimney Connector

This appliance, when installed in a Mobile Home, must be installed with:

A. One of the following 6" double-wall connector systems:

1. Security Model DL or DC

5. Metal Fab Model DW

2. Oliver MacLeod Model PV

6. Ameri-Tec Model DBSP

3. Energy Vent

7. Industrial Chimney Model Excel Ultra-Black

4. Selkirk Metalbestos Model DS

8. Simpson Dura-Vent Model DVL

B. As well as one of the following compatible chimney systems - All parts 6":

CANADA ONLY:

Security

Pro-Jet

ICC

Selkirk

Energy Vent

S2100

H.T.3000

Excel 2100

Sentinal CF

Commander 5000

Ceiling support

XSF

FCS

SF

CF-CSP

CH6LCS

Rafter radiation shield

RRS

3' Chimney length

XL3

SL3

L3

CF-36SL

CH636

2' Chimney length

XL2

SL2

L2

CF-24

CH624

Roof flashing

XFA

RF17

FA

CF-FRA

CH6TCF

Storm collar

XSC

SC

SC

CF-SC

CH6SC

Spark arrestor rain cap

XCPE

RCSA

CPE

CF-SA,CT

CH6RC, SS

USA ONLY:

Security

Pro-Jet

Security

Pro-Jet

Metalbestos MetalFab

Ameritech

ICC

Simpson Dura-Vent

S2100

H.T.3000

ASHT

HT3103

SSII

2100

TEC HS

Excel 103HT Dura/Plus Dura Tech

Ceiling support

XSF

FCS

SF

FCS

T-SFA

TGCSP

6PL-CS

RDS/SQS

SDP-SB

SDP-SB

Rafter radiation shield

RRS

RRS

T-JSMH

TGRS

3' Chimney length

XL3

SL3

L3

SL3

T-36

TG3

HS 36

CL48

SDP-P

SDT-P

2' Chimney length

XL2

SL2

L2

SL2

T-24

TG2

HS 24

CL24

SDP-P

SDT-P

Roof flashing

XFA

RF17

FA

RF

T-SFA

TGF

8RFFU

VF

SDP-F

SDT-F

Storm collar

XSC

SC

SC

SC

T-SC

TGSC

PL-ASCG

SC

SDP-SC

SDT-SC

Spark arrestor rain cap

XCPE

RCSA

CPE

RCSA

T-CT

TGC

6PL-MPC

RCS

SDP-C

SDT-C

Содержание SUPER 27 SPECTRUM

Страница 1: ...GUIDE Design D Models SUPER 27 SPECTRUM SPECTRUM CLASSIC PLEASE SAVE THESE INSTRUCTIONS SAFETY NOTICE Ifthisstoveisnotproperlyinstalled a house fire may result For your safety follow the installation...

Страница 2: ...Procedure 8 Floor Protector 9 Combustion Air 9 Operation 10 Wood Selection 10 How to Test Your Wood 10 Lighting for the First Time 10 Lighting a Fire 10 Normal Operation 10 Restarting After Extended...

Страница 3: ...nwoodandtoo slow a burning rate This heavy deposit is building up at least as quickly in the chimney WARNING ONLY USE MATERIALS SUPPLIED BY MANUFACTURER WHEN DOING MAINTE NANCE OR REPLACEMENTS 4 DOOR...

Страница 4: ...ust be lived with Regular inspection and cleaning is the solution The use of dry seasoned wood and ample com bustion air will help to minimize the buildup Chimney Fires The result of excessive creosot...

Страница 5: ...it in the upright position Super 27 only Assembly Crate Removal 1 Carefully remove wood top and supports 2 Remove plastic cover 3 Using a 7 16 wrench remove lag bolts that secure stove body to bottom...

Страница 6: ...Attach stove to flooring using two 1 4 x 2 or longer lag screws Warning Under no circumstances is this heater to be installed inamakeshiftor temporary manner Itmaybefiredonlyafter the following condit...

Страница 7: ...3 Energy Vent 7 Industrial Chimney Model Excel Ultra Black 4 Selkirk Metalbestos Model DS 8 Simpson Dura Vent Model DVL B As well as one of the following compatible chimney systems All parts 6 CANADA...

Страница 8: ...tmeetalllocalcodes Donotconnectthisunittoachimney flue serving another appliance Minimum system height is 15 feet 4 6 m measured from base of appliance Double Wall Connector Use a listed double wall c...

Страница 9: ...nt dislodging of the air duct Outside air may also be ducted from outside through the 4 diameter knockout hole in the rear of the pedestal or leg kit ash box enclosure If this method of supplying comb...

Страница 10: ...es it is very important that the room be well ventilated Open all windows and doors Smoke and fumes caused by the curing process may cause discomfort to some individuals Lighting a Fire WARNING Never...

Страница 11: ...om your Pacific Energy dealer Re install baffle assembly in reverse order The two side pieces of insulation must be tight against the siderails Restarting After Extended or Overnight Burns 1 Open door...

Страница 12: ...will allow the fan to turn on as the stove heats up to operating temperature It will also shut the blower off after the fire has gone out and the unit cooled to below a useful heat output range Manua...

Страница 13: ...dup See 1 2 3 above Low Heat Output 1 Wood is wet Use dry wood 2 Fire too small Build a larger fire 3 Draft too low Chimney plugged or restricted inspect and clean Won t Burn Overnight 1 Air control i...

Страница 14: ...Firebrick 4 x 4 1 2 x 1 1 4 1 pc 246 12d Firebrick 7 1 4 x 4 1 2 x 1 1 4 1 pc 245 All parts may be ordered from your nearest Pacific Energy dealer Contact Pacific Energy for the location of the deale...

Страница 15: ...x 1 1 4 1 pc 248 14b Firebrick 3 x 4 1 2 x 1 1 4 1 pc 247 14c Firebrick 4 x 4 1 2 x 1 1 4 1 pc 246 14d Firebrick 7 1 4 x 4 1 2 x 1 1 4 1 pc 245 14e Firebrick 9 x 4 1 2 x 1 1 4 17 pc 5096 99 Firebrick...

Страница 16: ...ss and thermal insulation Thehighmass weight actsasaheatstorageandthe thermal insulation keeps the combustion zone hot Activeflamingtakesplaceduringthefirstpartofthe burn During this stage heat is sto...

Страница 17: ...on its back 5 Using a 3 4 wrench remove 1 x 1 2 bolts and save for later use 6 Remove pallet retaining brackets from stove bottom Pedestal Kit 1 With the unit on its back and the removable cover facin...

Страница 18: ...equired tools two 1 2 wrench or socket or one 3 4 wrench or socket and one 3 8 wrench or socket one 7 16 wrench or socket Remove crate all models 1 Carefully remove wood top and supports 2 Remove plas...

Страница 19: ...FRONT SIDES AND BACK AS INDICATED MINIMUM CLEARANCES TO COMBUSTIBLE MATERIALS COMPONENTS REQUIRED FOR MOBILE HOME AND ALCOVE INSTALLATION OUTSIDE AIR KIT AND ONE OF THE FOLLOWING LISTED CONNECTORS SEC...

Страница 20: ...PACIFIC ENERGY FIREPLACE PRODUCTS LTD Box 1060 Duncan BC V9L 3Y2 Phone 250 748 1184 Web site http www pacificenergy net...

Отзывы: