2.2 RS-232 Local Programming
Figure 2.4 RS-232 CONNECTOR
2.2 Testing and Verifying the Installation
You must verify your telephone installation by calling every tenant. The easiest way to verify the installation is by connecting
a standard telephone to ES1 and ES2 on the Main Relay Control Panel (see figure 2.2) and figure 2.4.
Call every tenant using the standard phone as follows (see also table 2.3):
Step 1:
Lift the handset and wait for
“Two Long Beeps”
. You also hear the relay click.
Step 2:
Press # and the 4-digit relay number (i.e #0001, for relay #1) and the LED #1 on relay# 1 turns ON and the tenant
phone connected to relay# should ring. Always check the tenant phone, do not depend on the LED on the relay.
Step3:
Hang-up and repeat step 2 to test the next relay number.
Relay Board DIP Switches Setting
Each relay board in the Main Relay Control Panel and the Extended Relay panel represents 12 tenants. For example:
MS79024 consists of Main Control board and two relay boards. The last three digit represents the number of tenant. The
MX79xxx is needed to configure more than 120 tenants. See table 1.1 for DIP Switch setting.
Table 2.1 MS79012 - MS7910, MX79012 - MX79120 DIP SWITCHES SETTING
Pach and Company
Chapter 2
Page 7
AeGIS NPB9000P Series
INSTALLATION
06/20/11
ES1
ES2
Figure 2.4
MODEL MS79012 - MS79120 Main Relay Control Panel or MX79012-MX79120 Expansion Relay Panel
Relay # / Switch #
1
2
3
4
5
6
7
8
9
10
Relay 1 (1-12 tenants)
ON
OFF
OFF
OFF
OFF
OFF
OFF
OFF
OFF
OFF
Relay 2 (13-24 tenants)
OFF
ON
OFF
OFF
OFF
OFF
OFF
OFF
OFF
OFF
Relay 3 (25-36 tenants)
OFF
OFF
ON
OFF
OFF
OFF
OFF
OFF
OFF
OFF
Relay 4 (37-48 tenants)
OFF
OFF
OFF
ON
OFF
OFF
OFF
OFF
OFF
OFF
Relay 5 (49-60 tenants)
OFF
OFF
OFF
OFF
ON
OFF
OFF
OFF
OFF
OFF
Relay 6 (61-72 tenants)
OFF
OFF
OFF
OFF
OFF
ON
OFF
OFF
OFF
OFF
Relay 7 (73-84 tenants)
OFF
OFF
OFF
OFF
OFF
OFF
ON
OFF
OFF
OFF
Relay 8 (85-96 tenants)
OFF
OFF
OFF
OFF
OFF
OFF
OFF
ON
OFF
OFF
Relay 10 (109-120 tenants)
OFF
OFF
OFF
OFF
OFF
OFF
OFF
OFF
OFF
ON
Relay 9 (97-108 tenants)
OFF
OFF
OFF
OFF
OFF
OFF
OFF
OFF
ON
OFF
Содержание AeGIS NPB9000P Series
Страница 1: ...AeGIS NPB9000P Installation and Programming Manual REV 0620 11 ...
Страница 2: ......
Страница 4: ...Chapter 5 Trouble Shooting Guide 37 General FCC Requirements 40 Quick Guide 41 ...
Страница 13: ...Figure 2 2 Pach and Company Chapter 2 Page 5 AeGIS NPB9000P Series INSTALLATION 06 20 11 ...
Страница 14: ...Figure 2 3 Pach and Company Chapter 2 Page 6 AeGIS NPB9000P Series INSTALLATION 06 20 11 ...
Страница 49: ......