08/12
4-7
Section 4
Exhaust & Aftertreatment
The height differential between the supply module and dosing module can not exceed one meter. The supply module is
integrated into the DEF tank assembly, separation of the module from the tank is not allowed.
When relocating the components the maximum pressure DEF hose length, from Supply module to Dosing Module, is 3
meters (118”).
right hand under dPf and scr with clear Back of cab dEf tank
fIGurE 4-7:
RH Under Cab Exhaust with Clear Back of Cab Tank.
The installation and design of the Clear Back of Cab (CBOC) tank is highly integrated into the chassis and cooling system.
Kenworth does not allow relocation of this tank, only relocation of the supply module.
The height differential between the supply module and dosing module can not exceed one meter. The CBOC tank does
not have an integrated supply module. The standard KW installation is a supply module located inside of the frame rail.
When relocating either the supply module or the tank, the maximum height differential between the supply module and the
bottom of the tank is one meter. The maximum line length is 2 meters between supply module and DEF tank sending unit.
When relocating the components the maximum pressure DEF hose length, from Supply module to Dosing Module, is 3
meters (118”).
DEF Pressure hose must include a “trap” in the routing if Dosing Module is below the highest point of the Supply Module
(See Figure 4-9 on page 4-9).
Содержание Kenworth C500 2012
Страница 1: ...Kenworth Heavy Duty Body Builder Manual 2012...
Страница 2: ...This page intentionally left blank...
Страница 3: ...Kenworth Heavy Duty Body Builder Manual...
Страница 10: ...This page intentionally left blank...
Страница 12: ...This page intentionally left blank...
Страница 61: ...3 41 Section 3 Dimensions 08 12 Allison Transmission...
Страница 62: ...3 42 Section 3 Dimensions 08 12 This page intentionally left blank...
Страница 86: ...08 12 4 24 Section 4 Exhaust Aftertreatment This page intentionally left blank...
Страница 212: ...6 10 08 12 Section 6 Body Mounting This page intentionally left blank...
Страница 220: ...7 8 08 12 Section 7 Frame Modifications This page intentionally left blank...
Страница 228: ...8 8 08 12 Section 8 Electrical FIGURE 8 9 Fuel Filter Restriction Pressure Gauge Sensor Location typical...
Страница 242: ...8 22 08 12 Section 8 Electrical Figure 8 15 Specialty Switches...
Страница 244: ...8 24 08 12 Section 8 Electrical FIGURE 8 17 Spare Relay Harnesses...
Страница 254: ...8 34 08 12 Section 8 Electrical FIGURE 8 24 Chassis Power Distribution Center Mounting Above Washer Bottle...
Страница 257: ...8 37 08 12 Section 8 Electrical Figure 8 28 Aerocab Alternate Hardware Location FIGURE 8 29 Chassis Node Dimensions...
Страница 266: ...8 46 08 12 Section 8 Electrical This page intentionally left blank...
Страница 275: ...A 5 08 12 Appendix A Vehicle Identification This page intentionally left blank...
Страница 276: ...A 6 08 12 Appendix A Vehicle Identification Kenworth Truck Company P O Box 1000 Kirkland WA 98083 425 828 5000...