![P4 BiLED Скачать руководство пользователя страница 2](http://html1.mh-extra.com/html/p4/biled/biled_operating-instructions_3058689002.webp)
1 30
5
4
DO NOT SHORT CIRCUIT DISMANTLE OR INCINERATE
Ni-MH
TEL = +44(0)1328 850555
Ni-MH Battery 2.4V 4Ah
Type: S1 P/N: 102-2164
Batch No: MM-YY
COMMS
L
N
L
sw
a
b
a
b
COMMS
1 30
5
4
DO NOT SHORT CIRCUIT DISMANTLE OR INCINERATE
Ni-MH
TEL = +44(0)1328 850555
Ni-MH Battery 2.4V 4Ah
Type: S1 P/N: 102-2164
Batch No: MM-YY
L
N
L
sw
Removing Mounting Plate
4.
Connect the LED power cable from the gear tray into the LED unit
housed within the shroud. Repeat Step 1 in reverse to fit unit to ceiling.
1.
Remove the BiLED Surface Mounted from it protective box and remove
the mounting plate from the Shroud by unscrewing the x2No. M3 screws
on the front of the fitting. Place the shroud and the fixing screws in a safe
place for re-fitting later on.
1
Gear Tray Fitting
2
Wiring Detail
3
Wire Key
= Live
= Switch Live
= Nutural
= =Earth
= Coms 1
= Coms 2
Battery Connection
4
fig 1.
3.
Wire the connector block as per the label
guides. In case of maintained operation the
switched live must be connected to LSW terminal.
NOTE:
the switched live and the unswitched live
must be from the same phase.
2.
The BiLED Surface Mounting Plate as been design to work on a flat
surface.
Optional BESA adaptor plates is available, see separate instructions.
NOTE:
It is the fitters responsibility to find suitable fixing screws. Fixings
screws are not supplied with this fitting.
It is recommened that diagonal fixings are used (a or b) to ensure correct
fitment of the shroud.
Non Maintained
Maintained
N
L
N
L
Lsw
If fitted see product specification
5.
Apply mains supply to test the luminaire. The indicator LED will show
flashing green and the LEDs will illuminate if the Switched Live supply is
connected and switched on.
Applying Mains Supply
5
N
L
Lsw
Test Emergency Supply
6
6.
To test, briefly fail the supply to
illuminate sign from the internal battery.
The indicator LED will be extinguished.
Reconnect Mains Supply
7.
Reconnect the unswitched supply to restart battery charging, indicated
by the flashing green indicator LED. Reconnection of the Switched Live
will re-illuminate the LEDs from the mains supply if connected for
maintained operation.
7
Same as Step 5.