23
Assembly
FRAME AND WHEEL ASSEMBLY
Tools required : Medium Philips screwdriver, 5/16’ open end or adjustable wrench and needle
nose pliers.
1. Slide axle through holes in wheel support frame.
2. Slide wheels onto each axle, being sure that the valve stem (if pneumatic) is to the outside.
3. Slide flat washers (L) onto axle past the small hole. Insert cotter pin in axle hole and bent legs
of pin with needle nose pliers to secure.
4. Place heater on the assembled frame, making sure that the air inlet end is by the wheels, and
the mounting holes on the tank flange of the heater align with holes in frame.
5. Take the rear handle and align the mounting holes with the corresponding holes in the tank
flange/wheel frame, slide a screw through the holes and loosely attach a nut. Repeat for the other
2 holes, then fully tighten all 6 screws and nuts.
P125DKH & P215DKH ASSEMBLY
!
Do not operate heater without support frame fully assembled to tank.
CAUTION!
NEVER LEAVE HEATER UNATTENDED WHILE BURNING OR WHILE CONNECTED TO
A POWER SOURCE.
Hot Air Outlet
Rear Handle
Air Inlet
Fuel Tank
Flange
Screw
Thermostat
Knob
Wheel Tube Valve
Wheel
Support
Frame
Wheel Cap
Axle
Flat
Washer (L)
Wheel
Nut Cotter Pin
Содержание P125DKH
Страница 2: ...2...
Страница 36: ...19 36 Wiring Diagrams P70DKH P125DKH P215DKH...
Страница 43: ...43 Declaration Of Conformity...
Страница 44: ...P1PE Position One Power Equipment Isaac Way Pembroke Dock Pembrokeshire SA72 4RW...