![P+L Systems Satalite 18 Скачать руководство пользователя страница 2](http://html1.mh-extra.com/html/p-l-systems/satalite-18/satalite-18_instructions_3075811002.webp)
30W Tube Replacement
SPECIFICATION / REPLACEMENT PARTS
Unit
Satalite 18
Unit
Satalite 30
Voltage
230V ~ 50Hz
Voltage
230V ~ 50Hz
Dimensions(mm) 312 x 300 x 134
Dimensions(mm) 312 x 540 x 170
Coverage
30 Sq. Meters
Coverage
60 Sq. Meters
Weight
1.3 Kg
Weight
2.0 Kg
Light Output
18W
Light Output
30W
Tube
1 x TPX18
Tubes
2 x TPX15-18
Starter
1 x I154
Starters
2 x I154
Glueboards (x6) INL147
(White) Glueboards (x6) INL161 (White)
GLUEBOARD REPLACEMENT
GLUEBOARD REPLACEMENT SHOULD BE CARRIED OUT BY SERVICE PERSONNEL ONLY, AFTER
ENSURING THAT THE UNIT IS DISCONNECTED FROM THE MAINS SUPPLY.
The glueboard should be replaced every month with a genuine glupac
®
glueboard. Use of
non-approved glueboards may invalidate your guarantee.
To replace the glueboard…
1. Remove the used glupac
®
glueboard by simply sliding it out of the top of
the front reflector and either retain for insect evaluation or dispose of it hygienically.
2. Remove the protective release paper from the new glupac
®
glueboard.
3. Slowly slide the new glueboard into position along the two runners with
the adhesive side facing the tube(s).
Always ensure the selected genuine glupac
®
glueboards are compatible with your unit, available
from your pest control operator or P+L Systems Ltd.
TUBE REPLACEMENT
TUBE REPLACEMENT SHOULD BE CARRIED OUT BY SERVICE PERSONNEL ONLY, AFTER ENSURING THAT
THE UNIT IS DISCONNECTED FROM THE MAINS SUPPLY.
To ensure the efficiency of Satalite
TM
in catching flying insects, the UV tube(s) should be replaced
annually. After twelve months the phosphor coating that emits the correct wavelength of UV light
has burnt away and the UV output is diminished substantially.
To replace the UV tube(s) first remove the front guard as shown in the diagrams on the previous
page. Then remove the tube(s) by...
Satalite
TM
18
1. Pull the tube gently from the tube holder until it un-clips.
2. Gently rotate the tube until it becomes free from the tube support.
3. Dispose of the used UV tube in conjunction with local WEEE regulations.
Satalite
TM
30
1. Rotate the tube through 90 degrees.
2. Gently pull the tube away from the unit.
3. Dispose of the used UV tubes in conjunction with local WEEE regulations.
STARTER REPLACEMENT
STARTER REPLACEMENT SHOULD BE CARRIED OUT BY SERVICE PERSONNEL ONLY, AFTER ENSURING
THAT THE UNIT IS DISCONNECTED FROM THE MAINS SUPPLY.
The starter(s) provide(s) an extra spark to initially light the UV tube(s). Starters wear out and should
be replaced at the same intervals as the UV tube(s).
To replace the starter(s)…
1. Rotate the starter anti-clockwise.
2. Pull the starter free from the unit.
18W Tube Replacement
Glueboard Replacement
Starter Replacement
R4 04/14
C
2014
P+L Systems Ltd
Information provided on these instructions is modified and
updated from time to time. This is due to the constant
redevelopment of our products. As such, it is not intended that
you should rely on it or that it should form part of any contract.
Sterling House
Grimbald Crag Close
Knaresborough
North Yorkshire
HG5 8PJ UK
T +44 (0)800 988 5359
F +44 (0)1423 863 497
W www.pandlsystems.com
E [email protected]
WEEE Compliance No. WEE/GF0661QR