4
5
Oztent EYRE Owner’s Manual
Oztent EYRE Owner’s Manual
SETTING UP YOUR OZTENT
SETTING UP YOUR AWNING
6.
Hammer in all bottom Pegs.
7.
Pull out the guy ropes and peg them down at a rough 45
Degree angle to secure your tent.
8.
OPTIONAL
Extend the awning. Twist to unlock awning poles and twist
again to lock at desired height. Pop up the awning and secure
with guy ropes as shown.
LOWER ONE POLE DURING HEAVY RAIN.
1.
2.
Install your 2.3m Awning Poles. Lock them at the
height of your tent roof at first.
Assemble your ridge pole. Twist to lock at desired
location.
SETTING UP YOUR OZTENT FLY
1.
Throw your Oztent Fly over the erected tent. Tilt it
forward and zip the Oztent Fly on the top of the tent.
2.
Place the 1.7m poles on each side to create
spacing and secure with guy ropes as shown.
SETTING UP YOUR PEAK SIDE PANELS
1.9m
2.3m
3.
4.
Zip on the Peak Side Panels. Panels are marked A
and B. Match against the A,B markings on the tent.
Fully extend the 2.3m Awning Poles when the Peaked
Side Panel if fully zipped on.
5.
6.
Zip on the rest of the Peaked Side Panel. Secure
the velcro tabs to the poles.
Repeat for the second panel and then extend the
2.3m poles. Secure the poles with the guy ropes.
Note: For easy set-up, lower down the 1.9m poles
before zip on the panels.
OPTIONAL
ACCESSORIES