background image

 

 

SPECIFICATION 

 

 
INSTALLATION 

 

Please check all the items against the parts list after opening the box. Only all the items are complete, the 
installation could be followed. 
Step1 

Step2 

Step3 

Step4 

Step5 

Step6 

Step7

 

1)

 

Connect the bottom pole with base and keep arrow up. 

2)

 

Connect the top pole with bottom pole by hand.

 

 

3)

 

Please pull out the inner pole and lock the thread buckle. 

4)

 

Feed the power cord through the base and the bottom pole, and pull through around 1.75-2m of 
cable. 

5)

 

Place the power cord plug through base and two poles. Connect the power cord plug to heater 
head.  Make sure the clip is firm and arrow up. 

6)

 

Push the heater head onto the top inner tube and fix in position by 2 taping screws. Make sure the 
power cord is completely extracted out of the pole and fix the power cord on the base by power 
brackets. 

7)

 

Please tighten the power cord as shown. 

 

 

 

Model:  

OH010991 

 

Parts

 

Description

 

Quantity

 

Feature

 

Rocker Switch 

 

Heater Head 

Adjustable Height 

 

B1 

Top  Pole  with  inner 
pole 

Remote: 

Yes 

 

B2 

Bottom Pole 

Voltage:  

220-240V~50-60Hz 

 

C1 

Base 

Power:  

0/900/1200/2100W 

 

Tapping Screw 

Weight:  

14kg 

 

Clip 

Size:  

58.5 x 58.5 x 210cm 

 

Manual

 

 

 

 

Remote 

Отзывы: