page.
11
/
42
11
INSTALLATION
4.4
FIRST CONNECTION
1.
Remove the package.
2.
Locate machine on an even horizotal place.
3.
Connect electricity (380 V).
4.
Checks the sequence of phases (3 1 neutral).
5.
Connect air pressure (6-8 bar).
6.
Check oil level in filter-regulator.
►
The first connection should be made by service team. The manufacturer does not bear
responsibility for damages incurred by connection the machine by not service team.
First connection by service team:
Eliminate failures occured during transportation.
Check the uniformity of machine installation.
Check the electrical and air connections.
Switch on the machine
Instruct the operator of the machine
Give instruction on the safety and maintenance of machine
Note: If in new connection machine does not work, then the cause could be the inconsistency
of phases in the electrical network, so that motors does not rotate in the opposite direction, the
machine is protected by a special control-phase relay. Changes of phases in the connection socket
should be performed by service or qualified electrician.
►
When phase sequence incorrect or the inclusion of a phase sequence error message displays
on the screen. To return to the main menu, first you must disconnect the emergency stop or
reverse phases and then push the "Reset".
Содержание OMRM-133
Страница 1: ...USER MANUAL AUTOMATIC DOUBLE HEAD CUTTING SAW Model No OMRM 133 ...
Страница 40: ...page 39 42 39 CIRCUIT DIAGRAMS AUTO M ATIC DO UBLE HEAD C UTTING M AC HINE 02 02 201 2 ...
Страница 41: ...page 40 42 40 CIRCUIT DIAGRAMS AUTO M ATIC DO UBLE HEAD C UTTING M AC HINE 02 02 201 2 DISPLAY ...