Install hanging rail first.
Once you know the height of your screen on the wall, take the supplied hanging rail and measure up from
the top of the image 75mm. The top of the rail sits at the top of the frame which is 75mm higher than top
of the screen image. Screen image + 75mm = top of rail. (top of rail - 75mm = top of screen image)
Locate your wall studs. The Majes c Screen has a very solid and heavy frame. You must install the hanging
rail using the 4 mber screws provided and they must be drilled into wall studs or brickwork (use correct
masonary plugs if installing on an internal or external brick wall, not supplied)
The rail is 2.1 metres long for most screen sizes (unless other sizes are required) and should be fixed at 4
points if possible. Locate your wall studs and mark with either a pencil or use ‘post it s ckers’ or similar
over their loca on and mark them. Hold the rail just under the marks and transfer the posi on of the studs
to the rail using a marker. (DON'T remove any post it s ckers from the wall just yet - unless you have
marked the stud loca ons on the wall itself)
Drill the holes in the rail with at least a 3mm drill bit so the head of the screws countersink somewhat.
Use a spirit level or use your ceiling cornice as a parallel so the rail is level and screw into place.
CENTRE
rail
Stud loca ons for hanging rail - 3 mbers minimum, 4 ideal.
Note stud centres are normally 450mm apart for exterior walls and 600mm apart for
internal walls in Australia, unless otherwise specified. Refer to your house and room plans.