background image

 

Praktika T-01 turnstile 

 18 

 

 

Содержание Praktika T-01

Страница 1: ...MAINTENANCE OPERATIONS www oxgard com info oxgard com Tel 7 812 366 15 94 Praktika T 01 turnstile...

Страница 2: ......

Страница 3: ...tenance operations 3 Contents 1 General information 4 2 Conditions for maintenance 5 4 Checking turnstile parts 13 5 Lubrication of moving parts 14 6 Assembling and operation checking of the turnstile...

Страница 4: ...Should there be any failure MO should be performed immediately after repair works 1 3 During MO it is recommended to carry out the work by two qualified mechanical and electrical engineers acquainted...

Страница 5: ...erwise the manufacturer will void the product warranty CAUTION It is not recommended to adjust the limitation units of solenoid stroke Hall sensor bracket and spring tension These components are adjus...

Страница 6: ...from the electrical network 3 2 Removing LED panel Remove the plastic cover plug from the hole Fig 2 remove the screw fixing the LED panel using crosshead screwdriver Fig 3 slide the LED panel to the...

Страница 7: ...Maintenance operations 7 Fig 2...

Страница 8: ...t Fig 5 3 4 Next step is to fold the arms In order to do it press gently on the arms fixing cam in the direction shown in Fig 6 Arm shall be free rotating freely about the short axis Fold the second a...

Страница 9: ...Maintenance operations 9 Fig 5...

Страница 10: ...Praktika T 01 turnstile 10 Fig 6 Fig 7...

Страница 11: ...Maintenance operations 11 Fig 8 Fig 9...

Страница 12: ...01 turnstile 12 3 5 Removing of the lower cover of turnstile Remove two M6 DIN7985 screws Fig 8 Remove M6 GOST11738 84 screw Fig 9 Remove the lower cover by moving it vertically down as shown in Fig...

Страница 13: ...e from contamination 4 2 Check that all cables are securely connected 4 3 If necessary check and tighten the screw joints of turnstile 4 4 Check the condition of the toothed belt and its tension Fig 1...

Страница 14: ...xis of the roller lever Fig 13 5 3 Clip between the stopper unit and the solenoid Fig 14 Elements of the unit are located behind the roller lever shown on Fig 13 5 4 The rotation axis of unlocking arm...

Страница 15: ...Maintenance operations 15 Fig 13 Fig 14...

Страница 16: ...Praktika T 01 turnstile 16 Fig 15 Fig 16...

Страница 17: ...oxgard com 6 2 If it is necessary to repair damaged painted surfaces powder paint identical to the damaged RAL9005 shall be used in accordance with instructions for its use 6 3 Reassemble the turnstil...

Страница 18: ...Praktika T 01 turnstile 18...

Страница 19: ...Maintenance operations 19...

Страница 20: ...OOO Vozrozdenie 192289 Saint Petersburg Sofiyskaya st 66 Tel fax 7 812 366 15 94 www oxgard com info oxgard com...

Отзывы:

Похожие инструкции для Praktika T-01