VZR.247800.001
IM
Turnstile CUBE C-03
Installation Manual
9
3.5 Procedure for checking compliance of the installation place
ATTENTION:
THE PASSAGE ZONES SHALL BE ARRANGED TO
ALLOW RECORDING OF PASSAGES DURING TURNSTILE OPERATION
UNDER ACS CONTROL AND TO AVOID UNAUTHORIZED PASSAGES.
3.5.1
–turnstile passage zone arrangement and guidelines on
product orientation.
Recommended diagram
Not recommended diagram
Figure 3
–
Turnstile passage zone arrangement
NMT 50 mm
1-
protection