VZR.247800.001
IM
Turnstile CUBE C-03
Installation Manual
15
5
CONNECTING AND SETTING THE PRODUCT
Connection of the PSU, CP and ACS is carried out using the control board
located in the block of barrier arms under the safety cover.
To conveniently connect the turnstile and get access to all necessary
contacts, the turnstile should be partially disassembled. This scope of works
includes dismantling of the safety cover.
To do this, it is necessary to undo two screws (Figure 7
– 1) and four
screws (Figure 7
– 2), smoothly slide the cover up.
Figure 7
– Dismounting of the turnstile safety cover
Slide the cover till the end and free access to the rotation mechanism.
– the appearance of the control board and layout of the
connectors for connecting the PSU, CP, ACS and SFAS is shown.
1, 2 - screws