Oxford Plastics LOWPRO 15/10 Скачать руководство пользователя страница 2

WHAT IS A 

LOWPRO INFILL?

 

INSTALLATION GUIDE

INSTALLATION KIT

SELECT YOUR 

LOWPRO

The LowPro range covers trenches up to 1200mm.

Select the appropriate LowPro cover below & use the Infill strip to connect a series of trench 
covers together and remove trip hazards between boards.

The Infill is available for the LowPro 12/8 (in long or short sizes) & LowPro 15/10 (in long or short sizes). Use the long or short 
size of Infill depending on how you orientate the LowPro over the trench. The LowPro 11/11 does not have an Infill as it is 
designed to sit close to the ground (height = 18mm).  

Safety guidelines & maintenance

Installation Steps

Enough LowPro 12/08 or LowPro 15/10 
to safely span the length of the trench.
Use 1 LowPro Infill between 2 LowPro 
Trench Covers. Infills are connected  
by hand without additional tools.

Footway

Board

Driveway

Board

Footway

Board

Driveway

Board

Footway

Board

3.5t

3.5t

LowPro

12/08

LowPro

12/08

LowPro

15/10

LowPro

15/10

LowPro

15/10

LowPro

11/11

TRENCH SIZE  

UP TO  

700MM

TRENCH SIZE  

UP TO  

900MM

TRENCH SIZE  

UP TO 

1200MM

LowPro 12/8 is a 1 person lift.

LowPro 15/0 is a 2 person lift.

1. 

Assess the surrounding surface where 

the rubber edges will be resting.

4.

 Insert the 2nd plate in the bolt hole 

on the long or short side.  

7. 

Ensure the LowPro is sitting on the 

plate at both ends. 

Ensure your LowPro is clean & check 
the surface & Flexi-edges for signs 
of damage. 

Do not use damaged 

LowPros. 

2. 

Unscrew the plate and bolts at each 

end of the Infill.

5. 

Place the LowPro with the plates 

inserted over the trench.

8. 

Place the Infill between the LowPros 

& secure with 2 bolts at either end.

Always conduct a Site Safety Risk 
Assessment before working. LowPros 
have anti-slide Flexi-edges, however 
they can be bolted down if the SSRA 
warrants it.

3. 

Insert the plate underneath the 

LowPro through the bolt hole.

6. 

Place the next LowPro in line with the 

first over the Infill plate.

9. 

Continue placing LowPros over the 

trench & attaching Infills until the trench 
is fully covered.

Отзывы: