Device connections
Numbers correspond to the step in
which that connection is used.
1.
3.
3.
4.
7.
6.
5.
2.
4.
6.
1. Fibre module cages
2. Ethernet ports
3. PCIe cable ports
4. USB ports
5. VGA port
6. Power sockets
7. Power on/off
Installation advice
Recommended laboratory location:
Place device on a well-supported, strong, clean bench
Ensure data and power connectors are in close proximity
Ensure power sockets are easily accessible should a disconnection be
required in case of emergency
Sequencing should be carried out at a room temperature of +18
o
C to +22
o
C
Allow 30 cm clearance to rear and sides of device
Do not cover any ventilation grills
Warning
– rear of device heats up during operation
28 kg
Recommend 2 person lift to
better handle with care
Pre-installation
Before installing the device, the following should be available:
SFP+ modules and cabling for 2x 10 Gbps fibre OR cabling for 2x 10 Gbps Copper
A single Copper cable for hardware check
Fibre OR Copper ports providing:
IP address through DHCP
Outbound-only access to the internet over ports 80 and 443
1x Monitor (VGA compatible)
1x VGA cable
1x USB connected keyboard
1x USB connected mouse
3x Power supplies/wall sockets