background image

V2.00 - Installation Instructions, Specifications and Project Plans are effective 2/21/2017 . This information is updated periodically 
and should not be relied upon after 2 years from 2/21/2017 . Please visit OZCOBP.com to get current information.

9

7

8

6

4

5

3

2

ITEM 

NO. QTY.

PART 

NUMBER DESCRIPTION

1

1

Pavilion 

Base

OZCO 

Project #213 

- 12x12 

Pavilion w 

6x6 Posts

2

2

2x8 

Board

2x8x12'0"

3

2

2x8 

Board

2x8x11'9"

4

2

2x8 

Board

2x8x10'10"

5

2

2x8 

Board

2x8x9'1"

6

8 4x4 Post 4x4x2'6"

7

2

56668

4" Flush 

Inside 45 

(FI45-LS-4)

8

8

56650

OWT Timber 

Bolt 6-8"

8

  56680

2" Timber 

Bolt Heavy 

Duty Washer 

(OWT-TBW-2)

9

8

56650

OWT Timber 

Bolt 6-8"

4

  56680

2" Timber 

Bolt Heavy 

Duty Washer 

(OWT-TBW-2)

OZCO Project #213 - 12x12 Pavilion w 6x6 Posts

Pavilion Beam & Support

Содержание OZCO Project 213

Страница 1: ... effective 2 21 2017 This information is updated periodically and should not be relied upon after 2 years from 2 21 2017 Please visit OZCOBP com to get current information roofing shown translucent for clarity OZCO Project 213 12x12 Pavilion 6x6 Posts Pavilion Overview ...

Страница 2: ......

Страница 3: ...tion is updated periodically and should not be relied upon after 2 years from 2 21 2017 Please visit OZCOBP com to get current information 14 0 12 0 11 3 1 2 shown without roofing for clarity OZCO Project 213 12x12 Pavilion w 6x6 Posts Pavilion Overview 12 0 9 6 1 2 7 5 3 16 12 6 1 2 1 0 1 0 2 5 16 typ ...

Страница 4: ...and Project Plans are effective 2 21 2017 This information is updated periodically and should not be relied upon after 2 years from 2 21 2017 Please visit OZCOBP com to get current information Suggested Tools others may be required Pavilion Overview ...

Страница 5: ...lt Offset P2B BO LS 2 56668 4 Flush Inside 45 FI45 LS 4 16 56650 OWT Timber Bolt 6 8 8 56680 2 Timber Bolt Heavy Duty Washer OWT TBW 2 2 56619 Truss Base Fan 8 12 11 56611 Truss Accent TA LS 2 56625 OWT Timber Screw 1 3 4 2 56612 T Tie Plate TTP 4 56649 OWT Timber Bolt 4 6 3 56617 2 Standard Rafter Clip RC LS 2 3 56618 4 Standard Rafter Clip RC LS 4 1 56627 OWT Timber Screw 3 3 4 1 56647 OWT Timbe...

Страница 6: ...y and should not be relied upon after 2 years from 2 21 2017 Please visit OZCOBP com to get current information 56668 56650 56608 56636 56612 56619 56680 56628 56647 56627 56625 OZCO Scan QR barcode with smartphone for quick access to product installation instructions Pavilion OZCO 56677 20 Pavilion only 56618 56611 56649 56617 ...

Страница 7: ...odically and should not be relied upon after 2 years from 2 21 2017 Please visit OZCOBP com to get current information 2 great styles Same functionality choose your connection lifestyle both styles available for most products Ironwood 517XX series Laredo Sunset 566XX series Laredo Sunset Ironwood Laredo Sunset Ironwood 2 ...

Страница 8: ... visit OZCOBP com to get current information 12x length Pavilion cut list common to all 12 wide Pavilions Pavilion Cutlist 12 see Birds Foot template 2x6 Board 100 13 8 12 Rafter cut 8 8 1 8 4x4 Post 30 with Beauty cut removed 45 2 6 6x6 Post 8 8 0 2x6 Board 46 582 8 12 King Post 56 9 3 10 16 1 1 2 2x6 Board 37 5 8 12 Web cut 8 3 5 2 10 3 16 34 56 3 1 1 2 2x8 Board 141 11 9 2x8 Board 130 10 10 ...

Страница 9: ...2 21 2017 This information is updated periodically and should not be relied upon after 2 years from 2 21 2017 Please visit OZCOBP com to get current information Birds Foot 1 1 template Pavilion Cutlist 12 2x6 Board 100 13 8 12 Rafter cut A 8 8 1 8 1 2 1 2 1 5 1 8 1 1 2 90 56 1 1 4 ...

Страница 10: ...n after 2 years from 2 21 2017 Please visit OZCOBP com to get current information 12x length Pavilion cut list 2x8 length wise boards Pavilion Cutlist 12 12x12 12x16 12x20 2x8 Board 16 with 45 cuts 3 5 8 X 45 16 0 2x8 Board 99 75 8 3 3 4 2x8 Board 109 9 1 2x8 Board 10 with one 45 cut 3 5 8 X 45 10 0 2x8 Board 157 13 1 2x8 Board 12 with 45 cut 3 5 8 X 45 12 0 ...

Страница 11: ...ed periodically and should not be relied upon after 2 years from 2 21 2017 Please visit OZCOBP com to get current information 14 9 3 8 11 3 1 2 9 6 1 2 if site is not level see Ozco Site Leveling instruction Site Plan OZCO Project 213 12x12 Pavilion w 6x6 Posts Pavilion Site Plan Locate desired center of structure ...

Страница 12: ...cally and should not be relied upon after 2 years from 2 21 2017 Please visit OZCOBP com to get current information 3 2 1 OZCO Project 213 12x12 Pavilion w 6x6 Posts ledge Pavilion Base ITEM NO QTY PART NUMBER DESCRIPTION 1 4 6x6 Post 6x6x8 0 2 4 56608 6x6 Post Base Kit 6X6 PB LS 3 4 56636 Post to Beam Bolt Offset P2B BO LS ...

Страница 13: ...QTY PART NUMBER DESCRIPTION 1 1 Pavilion Base OZCO Project 213 12x12 Pavilion w 6x6 Posts 2 2 2x8 Board 2x8x12 0 3 2 2x8 Board 2x8x11 9 4 2 2x8 Board 2x8x10 10 5 2 2x8 Board 2x8x9 1 6 8 4x4 Post 4x4x2 6 7 2 56668 4 Flush Inside 45 FI45 LS 4 8 8 56650 OWT Timber Bolt 6 8 8 56680 2 Timber Bolt Heavy Duty Washer OWT TBW 2 9 8 56650 OWT Timber Bolt 6 8 4 56680 2 Timber Bolt Heavy Duty Washer OWT TBW 2...

Страница 14: ... 2 21 2017 Please visit OZCOBP com to get current information step 1 Outer Beams Pavilion Beam Support to all size Pavilions Simple 3 step procedure common Building your Canopy use this procedure for all size Pavilions 10x10 shown same construction steps and techniques apply repeat on all sides 10x10 Pavilion shown Tool Required HCN provided 3 8 Driver OWT Timber Screw provided ...

Страница 15: ...pdated periodically and should not be relied upon after 2 years from 2 21 2017 Please visit OZCOBP com to get current information step 2 Inside Beams Pavilion Beam Support Secure with nails or screws Repeat on all sides for additional beam rigidity apply polyurethane adhesive between boards repeat on all sides ...

Страница 16: ...2017 This information is updated periodically and should not be relied upon after 2 years from 2 21 2017 Please visit OZCOBP com to get current information flush Tool Required 3 8 Driver HCN provided OWT Timber Screw provided step 3 Knee Braces Pavilion Beam Support repeat on all sides ...

Страница 17: ... LS 1 56625 OWT Timber Screw 1 3 4 3 2 56612 T Tie Plate TTP 6 56611 Truss Accent TA LS 1 56625 OWT Timber Screw 1 3 4 4 1 56629 OWT Timber Screw 7 1 2 5 1 56647 OWT Timber Screw 10 6 1 56627 OWT Timber Screw 3 3 4 7 4 56649 OWT Timber Bolt 4 6 4 56680 2 Timber Bolt Heavy Duty Washer OWT TBW 2 8 3 56617 2 Standard Rafter Clip RC LS 2 9 3 56618 4 Standard Rafter Clips RC LS 4 10 1 2x8 Board 2x8x12 ...

Страница 18: ...Please visit OZCOBP com to get current information Tool Required 3 8 Driver OWT Timber Screw predrill holes 10x10 Pavilion shown temporary securing of Ridge Beam necessary not shown repeat step Building your Truss Simple 7 step procedure common to all size Pavilions use this procedure for all size Pavilions 10x10 shown same construction steps and techniques apply step 1 Pavilion Truss 10 ...

Страница 19: ... should not be relied upon after 2 years from 2 21 2017 Please visit OZCOBP com to get current information Tool Required 3 8 Driver OWT Timber Screw predrill holes 10x10 Pavilion shown repeat step step 2 Pavilion Truss 10 tip rafter screw heads might interfere with roofing secure flush below rafter or modify roofing materal as needed ...

Страница 20: ...ormation is updated periodically and should not be relied upon after 2 years from 2 21 2017 Please visit OZCOBP com to get current information 10x10 Pavilion shown repeat step 2 see overview page for spacing and quantity of Trusses Tool Required 3 8 Driver OWT Timber Screw step 3 Pavilion Truss 10 ...

Страница 21: ...1 2017 This information is updated periodically and should not be relied upon after 2 years from 2 21 2017 Please visit OZCOBP com to get current information 10x10 Pavilion shown repeat step repeat step Tool Required 3 8 Driver OWT Timber Screw predrill holes step 4 Pavilion Truss 10 ...

Страница 22: ...rmation is updated periodically and should not be relied upon after 2 years from 2 21 2017 Please visit OZCOBP com to get current information repeat step on all rafters Tool Required 3 8 Driver HCN OWT Timber Screw 10x10 Pavilion shown repeat step repeat step on all rafters step 5 Pavilion Truss 10 ...

Страница 23: ...tive 2 21 2017 This information is updated periodically and should not be relied upon after 2 years from 2 21 2017 Please visit OZCOBP com to get current information Tool Required 3 8 Driver HCN OWT Timber Screw 10x10 Pavilion shown repeat step level step 6 Pavilion Truss 10 ...

Страница 24: ...2 21 2017 This information is updated periodically and should not be relied upon after 2 years from 2 21 2017 Please visit OZCOBP com to get current information 10x10 Pavilion shown repeat step 6 on all rafters Tool Required 3 8 Driver HCN OWT Timber Screw step 7 Pavilion Truss 10 ...

Страница 25: ...is updated periodically and should not be relied upon after 2 years from 2 21 2017 Please visit OZCOBP com to get current information secure roofing with nails or screws 1 OZCO Project 213 12x12 Pavilion w 6x6 Posts Roofed Pavilion Truss 12 Roofing ITEM NO QTY PART NUMBER DESCRIPTION 1 36 1x6 Board 1x6x12 0 ...

Отзывы: