49
BIDI MODE
TEST NEXT FIBER/PAIR (SECOND BIDI DIRECTION)
Once the fibers have been tested in the first direction, swap the fibers as shown on the displays to test in the second
direction.
The fiber numbers to connect into are listed at the top of the display.
Once the fibers are connected as shown, press any key on the MASTER to test in the second direction. The MASTER will
show communications progress (as long as proper continuity is achieved).
23
3
4
5
6
5
6
7
8
3
4
5
6
6
7
8
REMOTE
WAIT.. FIBER#3&4
Please move the fiber ends
to the opposite ports.
020
TEST
EXIT
MENU
MM
OPM
Additional test cable
MASTER
MM
OPM
Additional test cable
FIBER#3&4
Please move the fiber ends
to the opposite ports and
press any key to continue.
019
Computer
Room
Data
Center
SOURCE
Encircled Flux
Mode Controller
Encircled Flux
Mode Controller
1
2
1
2
24