
Note
:
Depending upon the roughness of the surface, you may need to hold the template in
place with tape.
Using a 1/2" (13 mm) drill bit, drill 6 mounting holes 31/8" (80 mm) deep into the cinder block
surface. Drill through the mounting hole cut-out sections of the template.
Insert wall anchors into the mounting holes,and lightly tap them flush to the wall with a hammer.(Fig.3)
IMPORTANT
Masonry anchors MUST be seated firmly against the concrete or masonry, If mounting to
a wall covered with drywall/plaster,counter bore a hole through the drywall/plaster around
the mounting hole location,so that the anchor can be seated directly against the concrete
or masonry.
Step 4: Mounting to the Wall
Remove the cantilever assembly from the box.
With the help of an assistant, carefully hold the mount in
position over the mounting holes, and then securely bolt
the wall plate to the wall with supplied washers (N) and
3/8"-3 1/2" lag bolts (P). See Fig.4.
Fig.4
IMPORTANT
Tighten lag bolts so that wall plate is firmly attached to wall,but DO NOT over tighten.
The lag bolts can be damaged by over tightening which will strip their threading.
Final tightening of lag bolts should be done by hand using a ratchet wrench and socket.
6
3/8”-3 1/2” lag bolt
round washer
wall plate
Carefully remove the template from the wall and discard. Hold the template in an upright position
so as not to spill the collected dust..
NB012010