![Overland Storage SnapSAN S5000 Скачать руководство пользователя страница 17](http://html1.mh-extra.com/html/overland-storage/snapsan-s5000/snapsan-s5000_user-manual_1663023017.webp)
10400414-002 05/2013
©2013 Overland Storage, Inc.
3-2
SnapSAN S5000 Data Migration User Guide
Figure 3-2: Software Configuration
Phases
Execution of migration is divided into the following phases: pre-migration processing,
migration processing, and post-migration processing.
Pre-migration processing
Make preparations for data migration.
Migration processing
Migrate data and operations.
Usually, repeat migration until all the target logical disks are migrated.
Post-migration processing
Follow up data migration.
Preparation for Data Migration
This flow chart shows an overview of the pre-migration processing.