background image

Part Number 10400219-101 03/2009

©2009 Overland Storage, Inc.

Page 6 of 6

Power On Library

Before returning the unit to the rack, verify that it works.

1.

For SCSI systems, verify the 

terminators

 are still in 

place.

2.

Plug in the 

power cords

.

3.

Turn the power supply 

switch

 to ON (|).

4.

Tap the 

GUI

 to power on the library.

5.

Observe the POST process to verify the installation of 
the 

Z-Axis assemblies

:

Watch the 

shuttle assembly and track

 movement.

Make sure that nothing interferes with the track 
plate assembly through its 

full range of motion

.

NOTE: If problems occur, contact Overland Storage 
Technical Support.

Run Friction Test (Loose Screws)

Test the Z-Axis assemblies to make sure that they operate 
properly.

1.

From the touch-screen GUI, press 

Menu

 > 

Diagnostics > Vertical Calibration

.

2.

Press 

Initial Calibration

.

The library runs 10 cycles and displays the results.

3.

Verify that all the demand results are 

less than 100

.

IMPORTANT:  If any results are over 100, repeat 

Steps 2–3

. If acceptable results are still not 

attained, contact Overland Technical Support.

4.

Press 

Back

 three times.

5.

Power off the library, turn off the power supplies, and 
remove the 

power cords

.

Run Friction Test (Tightened Screws)

1.

In the order shown in 

Figure 23

, tighten the 

screws

 

until just snug.

Figure 23.  Tighten the Z-Axis Screws in This Order

2.

Next, in the same order, tighten the screws to around

 

6 lbs  torque

.

3.

Reconnect the 

power cords

, turn on the power 

supplies, and tap the GUI to power on the library.

4.

Press 

Menu > Diagnostics > Vertical Calibration > 

Initial Calibration

.

5.

Verify that all the demand results are 

less than 100

.

6.

Press 

Final Calibration

.

7.

Verify that all the demand results are 

less than 100

.

IMPORTANT:  If any results are over 100, power off 
the unit, loosen the screws, and repeat

 Steps 1–7

If acceptable results are still not attained after several 
attempts, contact Overland Technical Support.

8.

Press 

Back

 three times.

9.

Power off the library, turn off the power supplies, and 
remove the 

power cords

.

1.

Reinstall the front top cover by inserting the 

tabs

 into 

their slots and gently setting the cover into place.

2.

Reinstall the 

two retained top cover screws

.

3.

Using a mechanical lifter (or two people), reinstall the 

library

 into the rack.

4.

Manually open the doors and reinstall the 

magazines

.

5.

Reinstall any removed 

drive assemblies

.

6.

Reattach all 

external host cables

.

7.

Reconnect the 

power cords

, turn on the power 

supplies, and tap the GUI to power on the library.

8.

Place the 

removed parts

 in the 

replacement part 

box

 for returning to Overland Storage.

Tighten Screws

Tighten Screws

1

3

2

4

1

3

4

2

Reinstall the Library

Additional Help

You can get additional technical support on the Internet at 

http://support.overlandstorage.com

, or call 

1-877-654-3429 (toll-free U.S. & Canada), +44 (0) 118-9898050 (Europe), or +1 (858) 571-5555 Option 5 (International).

Содержание NEO 4000

Страница 1: ...ll four tape magazines IMPORTANT If the library is non operational the doors can be manually opened by pushing a stiff wire through the manual release holes Figure 1 Figure 1 Manual Door Release Locations 2 If operating use the GUI to power down the library 3 Turn the power supply switches to OFF O and remove the power cords 4 Remove all external host cables 5 Also to reduce weight we recommend re...

Страница 2: ...tive Z Axis remove the four screws and washers Figure 4 securing the Screw Rail to the track plate NOTE If unscrewing the rear Z Axis screws retain the Screw Rail clamp from the bottom Figure 4 Remove the Z Axis Screw Rail Screws 3 If the track plate is stuck in a raised position on the other Z Axis remove the four screws and washers Figure 4 securing the Screw Rail and carefully lower the track p...

Страница 3: ... Figure 9 Turn Front Z Axis Motor Coupler Inside View c Install the four new M3x20mm screws and M3 washers until snug then loosen them one turn NOTE The screws are tighten during the final unit test Be sure the cup washer is positioned correctly with the cup side up against the screwhead Figure 10 Figure 10 Screw and Cup Washer Assembly IMPORTANT Continue with Power On and Test the Library on page...

Страница 4: ...ctor to the bottom of the Z Axis drive motor 3 Using two new M3x6mm screws secure the Z Axis assembly to the two top mounting holes 4 Install new cable tie to secure the cables to the motor Figure 16 observing these points Cables in rear must be clear of the pulleys Locate the Tie ratchet away from the Screw Rail Trim the excess tie leader that extends beyond the tie ratchet Figure 16 Cable Tie an...

Страница 5: ...etained clip onto the bracket to secure the flex cable Figure 21 Verify that the flex cable is in the appropriate slot and that the clip is positioned in the notches Figure 21 Retaining Clip Notches Flex Cable Slot 7 Reinstall the Fan Cover a Carefully reposition the Fan Cover assembly over the opening and move it slightly toward the front to permit the deflector to enter the cavity b Reconnect th...

Страница 6: ...Next in the same order tighten the screws to around 6 lbs torque 3 Reconnect the power cords turn on the power supplies and tap the GUI to power on the library 4 Press Menu Diagnostics Vertical Calibration Initial Calibration 5 Verify that all the demand results are less than 100 6 Press Final Calibration 7 Verify that all the demand results are less than 100 IMPORTANT If any results are over 100 ...

Отзывы: