Part Number 10400219-101 03/2009
©2009 Overland Storage, Inc.
Page 6 of 6
Power On Library
Before returning the unit to the rack, verify that it works.
1.
For SCSI systems, verify the
terminators
are still in
place.
2.
Plug in the
power cords
.
3.
Turn the power supply
switch
to ON (|).
4.
Tap the
GUI
to power on the library.
5.
Observe the POST process to verify the installation of
the
Z-Axis assemblies
:
•
Watch the
shuttle assembly and track
movement.
•
Make sure that nothing interferes with the track
plate assembly through its
full range of motion
.
NOTE: If problems occur, contact Overland Storage
Technical Support.
Run Friction Test (Loose Screws)
Test the Z-Axis assemblies to make sure that they operate
properly.
1.
From the touch-screen GUI, press
Menu
>
Diagnostics > Vertical Calibration
.
2.
Press
Initial Calibration
.
The library runs 10 cycles and displays the results.
3.
Verify that all the demand results are
less than 100
.
IMPORTANT: If any results are over 100, repeat
. If acceptable results are still not
attained, contact Overland Technical Support.
4.
Press
Back
three times.
5.
Power off the library, turn off the power supplies, and
remove the
power cords
.
Run Friction Test (Tightened Screws)
1.
In the order shown in
, tighten the
screws
until just snug.
Figure 23. Tighten the Z-Axis Screws in This Order
2.
Next, in the same order, tighten the screws to around
6 lbs torque
.
3.
Reconnect the
power cords
, turn on the power
supplies, and tap the GUI to power on the library.
4.
Press
Menu > Diagnostics > Vertical Calibration >
Initial Calibration
.
5.
Verify that all the demand results are
less than 100
.
6.
Press
Final Calibration
.
7.
Verify that all the demand results are
less than 100
.
IMPORTANT: If any results are over 100, power off
the unit, loosen the screws, and repeat
If acceptable results are still not attained after several
attempts, contact Overland Technical Support.
8.
Press
Back
three times.
9.
Power off the library, turn off the power supplies, and
remove the
power cords
.
1.
Reinstall the front top cover by inserting the
tabs
into
their slots and gently setting the cover into place.
2.
Reinstall the
two retained top cover screws
.
3.
Using a mechanical lifter (or two people), reinstall the
library
into the rack.
4.
Manually open the doors and reinstall the
magazines
.
5.
Reinstall any removed
drive assemblies
.
6.
Reattach all
external host cables
.
7.
Reconnect the
power cords
, turn on the power
supplies, and tap the GUI to power on the library.
8.
Place the
removed parts
in the
replacement part
box
for returning to Overland Storage.
Tighten Screws
Tighten Screws
1
3
2
4
1
3
4
2
Reinstall the Library
Additional Help
You can get additional technical support on the Internet at
http://support.overlandstorage.com
, or call