
PRECAUTIONS
General information
Read this installation guide and the safety instructions carefully before starting installation
of this product. All the instructions given must be followed closely and this guide must be
stored in a safe place throughout the service life of your product. Any installation or use
outside the specified field of application is forbidden. This invalidates the warranty and discharges
Overkiz of all liability, as does any failure to comply with the instructions given herein.
General safety instructions
- Do not try to open the housing.
- Avoid impacts or dropping.
- Never immerse the product in liquid.
- Do not use abrasive products or solvents to clean the product. Its surface can be cleaned using a soft
dry cloth.
- Do not use this product outdoors. Do not route the cables outdoors.
- Only connect the product to Hattara® DIN Rail modules.
- Never try to insert any object into the connectors or openings of the module.
- Do not place the product in a metallic enclosure or a unit with a metal door.
- Any use or modification of the equipment not foreseen by this guide can endanger the installer or
user.
The product can be switched off completely in several ways:
- The MR-ZBEE module is connected directly to the Hattara® DIN Rail CU module: the product is
switched off by disconnecting the Hattara® DIN Rail CU module from the Hattara® DIN Rail power
supply unit.
- The MR-ZBEE module is connected by cable to the radio module connected to the Hattara® DIN Rail
CU module or to any other radio module: the product is switched off by disconnecting the cable from
the MR-ZBEE module.
INSTALLATION
Prerequisites
- A panel box equipped with a DIN rail, type TS-35/7.5 or TS-35/15 and a Hattara® DIN Rail CU product
(see the product guide for more information).
- Installation must be carried out by a professional.
- The power is supplied via the interconnection cable or the connector for the CU module.
- Do not connect any load to the available USB port.
- Ensure that 4 radio modules maximum will be connected to the Hattara® DIN Rail CU product after
the installation of this module.
Installation
The product must be installed without the antenna mounted.
It can be installed in two different ways:
If the location for an additional module is free on the Hattara® DIN Rail CU product:
- Use the radio module without the DIN rail mounting
- Insert the connector for the CU module into the “first radio module connector” (see the product guide
for more information).
If the “first module” location is occupied:
- Use the DIN Rail mounting supplied.
- Clip the module to the DIN Rail mounting.
- Fasten the module with the mounting to the DIN rail.
- Connect the MR-ZBEE module to the previous module using the interconnection cable supplied. The
cable must be connected to the right-hand bridging connector of the previous module and to the
left-hand bridging connector of the MR-ZBEE module.
Caution: the cables must never cross.
- Ensure to leave a few centimetres between the radio modules in order to obtain optimum radio
performances.
- Caution: the antennas must be installed vertically, pointing upwards,
and must never cross
- Screw the antenna supplied to the antenna connector.
The module is ready to be started.
Allée de la Mandallaz - Immeuble Variation A
74370 METZ-TESSY - FRANCE
Hattara
®
DIN Rail
4
MR-ZBEE module
EN
Introduction
Illustration
1
2
3
4
4
3
2
1
Used with the Zigbee radio equipment, the Hattara® DIN Rail Zigbee module
enables you to pilot and programme scenarios for your installations.