OverEZ Chicken Coop MOEZCKCP Скачать руководство пользователя страница 2

OverEZ!

Assembly is

Watch our assembly video here

Place FLOOR in desired location.
Important:  Floor must be level  

in both directions.
Find the bag with drill bits, keys, 

and touch up paint (to repair any 

mars on pre-painted surfaces).

Place BACK WALL (A), making sure 

wall is tight against floor and ends  

of wall line up with marks provided 

on floor. 
Drive 2 pre-started screws on the 

bottom.

Place CHICKEN DOOR GABLE WALL (B).
Siding from BACK WALL will slide into 

cavity provided. Make sure wall is 

tight against floor. 
Drive 2 pre-started screws on corners, 

then drive 1 screw (provided in the 

bag) into the pre-drilled hole into 

side of door frame.

Install MAN DOOR GABLE WALL (D).
Siding from BACK WALL and FRONT 

WALL will slide into cavities provided.
Make sure wall is tight against floor.
Drive 2 pre-started screws into back 

corner, 1 pre-started screw through top 

plate in upper front corner, then drive 

1 screw (provided in the bag) into the 

pre-drilled hole into side of door frame.

Install ROOF PANEL. 
Lower front edge of ROOF PANEL onto 

FRONT WALL first, then lower back 

edge onto BACK WALL.

step

 

four

Place FRONT WALL (C), making sure 

wall is tight against lower support wall.
Siding from FRONT WALL will slide 

into cavity provided in CHICKEN DOOR 

GABLE WALL.
Drive 2 pre-started screws 

on corners, then 2 pre-started screws 

on bottom.

step

 

three

step

 

two

step

 

one

step

 

six

step

 

five

Put black screw in bottom hinge of 

doors.
Drop ROOST BARS into slots provided 

on inside of gable walls.
Hook CHICKEN RAMP at bottom of 

chicken door.

step

 

seven

NOTE:  To loosen or tighten door latches, use supplied allen wrench.

Loosen small screw on inside of latch with allen wrench, moving the 

latch in or out. Tighten screw and test.

Please note: Actual product may differ slightly from instructional illustrations.

Drive 4 pre-started screws through sheathing into gable and 2 pre-started 

screws through front and back wall top plates.

(Remove 2 Roosts From Pallet)

Отзывы: