
If there are any steps you do not
complete or if you respond with ‘No’,
please explain in the comments field!
Tick as appropriate or
enter a value/number
Comments/settings
Yes
No
7
Was a functional check carried out
to review performance (see op-
erating instructions for functional
check)?
¨
¨
8
Were all ball valves checked for
ease of movement?
¨
¨
9
If there were any strainers installed
on site, have they been cleaned?
¨
¨
10
Are all isolating valves open?
¨
¨
11
Was the storage cylinder side bled
and were the bleeders checked for
opening and functionality?
¨
¨
12
Were the controller values com-
pared with the details in the hando-
ver report (document any deviations
in the comments)?
¨
¨
Maintenance work
1
Which potable water temperature
was entered?
°C
2
Was circulation activated?
¨
¨
2.1
Which mode was activated?
3
Is the controller LED lit up green?
¨
¨
4
Have additional changes been
made to the controller settings?
¨
¨
Repair work (only complete in the event of repairs or component replacements)
1
Which component was replaced?
1.1
Reason for replacement
2
Which component was replaced?
2.1
Reason for replacement
3
Which component was replaced?
3.1
Reason for replacement
4
Was commissioning carried out
in accordance with the operating
instructions after having completed
the repair work?
¨
¨
Содержание Regumaq X-25
Страница 1: ...Valves controls systems Operating instructions EN Fresh water station Regumaq X 25 ...
Страница 2: ......
Страница 58: ...Appendix Regumaq X 25 58 138112581 V01 10 2019 14 3 EU Declaration of conformity ...
Страница 66: ......
Страница 67: ......
Страница 68: ...OVENTROP GmbH Co KG Paul Oventrop Straße 1 59939 Olsberg GERMANY www oventrop com 138112581 V01 10 2019 ...