3.ISUP Board inflation Steps
a.Unscrew the valve cap and press down on the pin to open the
valve. Let the air flow naturally into the product, then press down on
the pin again to close the valve (in the ‘UP’ position).
b.Make sure the pump hose is connected to the ‘inflate’ outlet.
c.Attach the pump hose with a half twist clockwise onto the valve.
d.Start pumping air into the board by sliding the piston up and down.
Inflate until you reach the required pressure. Minimum 12psi for
proper ISUP operation and a maximum of 15psi for this product.
e.After inflation, tighten the valve cap, so the board stays secure.
4.Fin installation
The two side fins are fixed onto the product. Once the board is
inflated, slide in the middle fin to the base and insert the fixed pin.
-5-