A
.
Bag x1
D
.
Pole x3
F
.
Nails
x12
G
.
Wind rope x 5
B
.
Internal tent x1
C
.
External tent x1
1.Take out the inner tent and pave it
flat, find 2 poles of the same length,
and penetrate into the corresponding
position.
2. Put the poles into the copper rings
at the four corners of the tent.
3.Hang the hook on the tent to the
pole.
1. Pull out the ground nails and
windproof rope
.
2.Remove the buckle and pull out
the pole from the copper ring
3. Remove the poles, fold the tent,
organize the accessories, and put
them in the packaging bag.
EN
Open
steps:
Storage steps:
4. Take out the external tent, find the
remaining pole, and pass the pole
through the pole sleeve.
5.Cover the outer tent outside the
inner tent, put the pole into the
copper ring of the tent foot.
6. The fixed position of the ground
nail wind rope.