OUTLINE S.R.L.
Via Leonardo da Vinci, 56
25020 Flero (Brescia) Italy
Tel.: +39 030.3581341
Fax +39 030.3580431
www.outline.it
10
APPENDIX - PERIODIC CONTROLS
All the loudspeakers, before the shipment, are ful-
ly tested at the end of the production line, but before
the system is installed an overall check shall be per-
formed to ensure that the system has not been dam-
aged during the shipment. Periodic controls shall be
performed at regular time intervals. The following ta-
ble represents an ideal check list and shall be com-
pleted with the external rigging elements.
Loudspeaker Serial Number: Position:
Date
Transducers Impedance
Amplifier
Loudspeaker cabinet
Loudspeaker grills
Grills screws
Hardware
Hardware bolts
Main rigging structure
Safety devices
Additional notes
Signature