PLEASE READ THE FOLLOWING ERECTION
INSTRUCTIONS CAREFULLY.
TIP:
Refer to the photograph to help when pitching your Ozone 6.0XT
1. Spread the flysheet out on the
ground of your pitch in the place
you want to pitch it.
2. Peg down the four corners of the
tent to hold it down whilst you inflate
the AirFrame Tubes.
3. Before inflating any of the AirFrame
Tubes make sure the Dynamic Speed
Valve quick release buttons are pressed
out. This makes sure the air will be held
inside the Airframe.
4. Next, attach the pump to the first of
the five Dynamic Speed Valves and
begin to carefully inflate—taking care
that no part of the fabric is caught any-
where.
4
6. Repeat steps four and five with the
other four AirFrame Tubes. Then
place the caps back in the valves and
cover with the Velcro sleeve to keep
the outside of the tent looking neat
and tidy.
7. Then peg out and tension the tent. Use
the adjustable pegging straps to tension
the tent as you desire. Make sure you
don’t over tension the fabric. If a door is
taut it may be too tight and that could
cause damage.
5. Inflate the Airframe until you can
give it a good squeeze. The tube wants
to have room inside for air to expand.
Don’t worry if you do keep inflating—
the Intelligent Frame will release any
excess air. (Please note the Intelligent
Frame is set to 5.5psi).
5
8. Finally. peg out the Reflective Endur-
ance Storm Straps for extra stability.
Please make sure in heavier weather
you use all the guy lines and storm
straps to hold the awning in place.