Hint:
Use a chalk
line to mark location
of floor joists to
determine screw
placement.
11 .
With Plywood
positioned correctly on
floor framing, attach
with 1 1/4” screws. Use
screws every 16”.
B. Wall Section
Exploded view of all parts necessary to
complete the Wall Section. Identify all
parts prior to starting.
Window Wall
Panel (1)
Side Top Plates
(2 per side)
Angle cut on edge
Front and Rear Top
Plates (3 per side)
2 Angle cut on 1 end and 1
square cut.
Gable Walls
(4)
Door Jamb
Narrow Wall Panel
(12” wide)
Solid Wall
Panel (6)
Door Header
Toll Free 1-888-658-1658 www.outdoorlivingtoday.com [email protected]
Page 7
Bottom Wall Plate
12.
Starting with Solid Wall Panels, carefully
lay panel face down. Position and attach Bottom
Wall Plate to bottom of wall studs of each wall
panel with 3 - 2 1/2” screws. Position so plates
are flush with framing. Note: some Bottom Wall
Plates may already be attached to some walls.
Parts (Step 12 )
Solid Wall Panels
(45 1/2” x 75”)
x 6
Bottom Wall Plates
(1 1/2” x 2 1/2” x 45 1/2”)
x 6
Hardware (Step 12 )
S1
- 2 1/2” Screws
x 36 total