48.
Locate Middle Roof Panel and
place on middle rafters.
49.
With Middle Roof Panel aligned as per
Step 47
,
tack panel down to rafters with 2 - 2.5” screws in the
bottom row of shingles.
50.
Lift up, position and attach 2nd Outside Roof Panel on Rafters as per
Step 47
.
47.
Place Roof Panel so it sits flush on 3rd rafter from the outside (doubled up rafter). Lowest batten on
roof should be flush with end of rafter at bottom. From the outside, screw down through bottom row of
shingles into rafter with 1 - 2 1/2” screw. Angle a 2 1/2” screw from outside rafter into roof batten.
Shingles overhang battens
on Outside Roof Panel.