9
(Rear view of the barbecue trolley.)
Attach the screen (C6) to the front left/right
legs as shown.
C6
Leak Test Diagram
ASSEMBLY IS NOW COMPLETE.
PROCEED TO THE NEXT PAGE FOR INSTRUCTIONS ON OPERATION AND MAINTENANCE.
ALL JOINTS AND CONNECTIONS
MUST NOW BE LEAK TESTED
BEFORE USING THE BBQ. FOR
DETAILS OF LEAK TESTING,
PLEASE REFER TO INSTRUCTIONS
ON PAGE 11.
Connect the gas hose (
B12
) to the BBQ. Ensure
the mating faces of the connection are clean and
not damaged. Do not use any sealing tape,
paste or liquid on the joint. The nut must be
tightened with a spanner. Do not use force which
may damage the assembly.
Attach the warming rack (B13) to the
hood as shown.
9
10