INSTALLATION GUIDE
21.2.2020
I
max Al
I
max Cu
U
max
VC05-0011
120 A
135 A
1000 V
90 A
115 A
600 V
Screw
Thread
M8
Tightening torque
M
2,5-16 mm² (6-14 AWG)
3 Nm
Stripping length
L
15 mm
SW
4
25-35 mm² (2-4 AWG)
6 Nm
-
-
-
-
Max. Wire cross section
35 mm²
1,5 mm
2
2,5 mm
2
6 mm
2
10 mm
2
16 mm
2
25 mm
2
35 mm
2
50 mm
2
-
3 (1)
3 (1)
3 (1)
2 (1)
1 (1)
1 (1)
-
70 mm
2
95 mm
2
120 mm
2
150 mm
2
185 mm
2
240 mm
2
300 mm
2
400 mm
2
-
-
-
-
-
-
-
-
Ouneva Oy
Teollisuustie 21
Tel. +358 400 179 750
FI-82730 Tuupovaara, Finland
Conductor installation
Marking
Connection
Copper conductors
Aluminium conductors
Supported IEC 60228 -conductors
Sector shaped cable
Cross section and max. number of Cu- conductors / space (Al- conductors in parenthesis)
Product data
OTL-connector 3x1xAl/Cu 2,5-35mm² (Grey)
Installation
Product code
Product name
I
n Al
I
n Cu
U
n
US specific
Certification and approval
DIN-rail mounting
Removing from DIN-rail
Release the plastic snap with a
screwdriver. Lift the connector.
DIN-rail mounting
Set the connector on DIN-rail.
Push until connector locks down.
L
SW
The specified max. amount of
conductors refers only to industrially
installed terminals.
Class 5 & 6 (fine stranded) Using
ferrule is recommended
Class 1 & 2 (solid and
stranded)
Max. 3 X CU /
Conductor space
1 X AL / Conductor
space
Anti-corrosion
paste: e.g. Penetrox
Pre-round the cable
≤ 35 mm² total
Support connector
during tightening the
screws
5 mm width
(Eg. Partex TX)