
14
>
Tools required:
711M3 mounting tool, 711M1 mounting tool (alignment rod)
and either 711M2 mounting plate or vice
►
Install the mounting tool on the alignment rod.
INFORMATION: The alignment rod must be clamped in a
vice, vertically for donning and horizontally for removal.
►
When using the mounting plate:
INFORMATION: Install the mounting plate on a suitable
surface and at optimal working height.
Attach the alignment rod to the mounting plate.
►
When using a vice:
Clamp the alignment rod into a vice at optimal working height.
►
Lock the wrist joint, if any.
►
Set the prosthetic hand to hand position "Donning Mode" as
follows:
OFF
AUS
►
Turn the prosthesis off using the switch on the prosthetic
arm.
►
Move the thumb to the opposition position.
Содержание 8E70-BBH
Страница 104: ...104 2 2 1 bebionic 2 2 2 3 10 C 60 C 14 F 140 F 20 C 40 C 4 F 104 F 20 C 60 C 4 F 140 F 80 60 C 140 F 2 4 3 3 1 3 2...
Страница 105: ...105 4 1 1 bebionic Skin Silicone 1 647G1362 1 646D1259 1 647G1367 1 1...
Страница 106: ...106 2 2 0 711M2 2 0 711M1 2 0 711M3 5 5 1 711M3 711M1 711M2...
Страница 107: ...107 OFF AUS ON EIN...
Страница 108: ...108 5 2 640F18...
Страница 109: ...109 5 3 640F18...
Страница 110: ...110 6 6 1 6 2...
Страница 111: ...111 1 2 3 7 8 8 1 8 2 93 42 EEC VII CE 9 8S710 R L S M L 20 8S711 R L S M L 2 3 4 6 9 11 14 16...