background image

7

Forandringer forbeholdes / Subject to changes without notice

ALP

H

A2L

    

 25-
60 

130

PO
W

ER

ON

A

KV

FV

Varme-

pumpe

50RCE                 PV 12

Varmeanlegg

ALP

H

A2L

    

 25-
60 

130

PO
W

ER

ON

A

KV

FV

Varme-

pumpe

50RC                  PV 12

Varmeanlegg

AL

PHA
2L

    

 25
-60 13

0

POWER

ON

A

Varme-

pumpe

Varmeanlegg

50RE                  PV 12

AL

PHA
2L

    

 25
-60 13

0

POWER

ON

A

Varme-

pumpe

Varmeanlegg

50R                  PV 12

AL

PHA
2L

    

 25
-60 13

0

POWER

ON

A

Varme-

pumpe

Varmeanlegg

50RE 50                 PV 12

ALP

H

A2L

    

 25-
60 

130

PO
W

ER

ON

A

Varme-

pumpe

Varmeanlegg

50RE 50                  PV 12

Installation suggestions

The OSO Accu 50-series can be fitted in many configurations. Above is shown a few examples.

Heat

pump

Heat

pump

Heat

pump

Heat

pump

Heat

pump

Heat

pump

Central heating

Central heating

Central heating

Central heating

Central heating

Central heating

Содержание Accu 50R

Страница 1: ...__________________________________________________ Tel _____________________ Dato date _____________ Aut elektriker Electrician ___________________________________________________ Tel ________________...

Страница 2: ...al for ettervarming plassert h yt oppe i tanken 50 100 l volum har 9 kW 3x3 sentral mens 300 l volum har 15 kW 3x5 sentral montert For mer info om el sentraler og koblingsskjemaer se side 3 10 rs gara...

Страница 3: ...nger er tette Gjenta etter ca 1 ukes drift Sjekk deretter rlig Sikkerhetsventilens funksjon skal testes rlig ved pne ventilen og kontrollere at vannet renner fritt Vri rattet mot klok ken til vannet f...

Страница 4: ...anlegg ALPHA2L 25 60 130 POWER ON A Varme pumpe Varmeanlegg 50RE PV 12 ALPHA2L 25 60 130 POWER ON A Varme pumpe Varmeanlegg 50R PV 12 ALPHA2L 25 60 130 POWER ON A Varme pumpe Varmeanlegg 50RE 50 PV 12...

Страница 5: ...t banks 50RE and 50RCE are equipped with an electric reheater element bank near the top of the vessel the 50 and 100 litres units is fitted with a 9 kW 3x3 element bank while the 300 litres unit is fi...

Страница 6: ...ecting the power supply Annual check up When the system is installed check all connections for leaks Repeat after approx one week in service then check annually The function of the safety valve must b...

Страница 7: ...LPHA2L 25 60 130 POWER ON A Varme pumpe Varmeanlegg 50R PV 12 ALPHA2L 25 60 130 POWER ON A Varme pumpe Varmeanlegg 50RE 50 PV 12 ALPHA2L 25 60 130 POWER ON A Varme pumpe Varmeanlegg 50RE 50 PV 12 Inst...

Страница 8: ...n 2 weeks of written notice being given to OSO Hotwater of the defect Such replacement parts shall be guaranteed under the terms of this guarantee to the unexpired period of the aforementioned 2 year...

Отзывы: