INSTRUCTIONS FOR INSTALLATION
We reserve the right of alternations
Page
9
3.0. Installation
3.1. Content included in delivery
TERMO boilers are delivered pre-assembled. Check
that all parts have been delivered intact. For exact
list of parts see figure and table below. If parts are
damaged or missing, please consult Oso Hotwater
UK Ltd.
Contents included with delivery
Item
Quantity
Description
1
1
TERMO boiler
2
1
Instructions
Electrical drawing, Warranty card
3
1
Hanging bracket
4
1
Safety valve (not fitted to boiler in case of TERMO RS)
Table of contents included with delivery
3.2 Standards & Regulations
The Oso Termo range of boilers are BEAB approved and CE marked.
Health and Safety at Work Act 1974 - When working with Termo boilers, ensure that protective clothing
and equipment is used appropriate to parts that may considered hazardous to health and safety
Control of Substances Hazardous to Health (COSHH 1988) - Glues, paints and sealants are used in the
manufacture of this product and present no known hazards when used in the manner for which they are
intended.
The guarantee is only valid if the following the following conditions are observed:
The boiler must be installed by a registered engineer to comply with current building regulations, IEE
electrical wiring regulations (BS 7671), local authority regulations, water supply regulations and health
and safety at work regulations.
Other Relevant British/European standards should be adhered to, including
BS 5449 - Specification for forced circulation hot water central heating for domestic premises,
BS 7593, treatment of water in domestic hot water central heating systems
3.3. Physical Installation site
IMPORTANT - MOVING THE BOILER EXCEEDS THE RECOMMENDED WEIGHT FOR A ONE MAN LIFT.
The boiler must be handled and transported carefully and stored in a safe, dry place.
TERMO-Plus AND TERMO-PTV are designed for wall installation in an upright position. Wall brackets are
provided on the back of the boiler. The boiler should be fixed in position on a suitable load-bearing wall prior to
pipe connection.
The boiler should be fitted in a dry place not subject to extremes of temperature. Cylinder cupboards and kitchens
are acceptable but bath or showers rooms are not.