background image

12

4.1   Filling with water

First check that all pipes are connected correctly. 

Then proceed as follows:

A) Open a hot tap – leave it open

B) Open the cold water supply to the product.

Check that the water from the open hot water tap 

is flowing freely, without any air locks. Close hot 

tap.

 Follow the instructions for an 

external heat source.

4.2 Turning on the power

When the cylinder has been filled with water, the 

power can be switched on. 

4.3 Control points

A)  Check  that  all  pipe  connections  to/from  the

product are tight and not leaking.

B)  Check that the power supply to the product is

not at risk of exposure to mechanical, thermal 

or chemical damage.

C)  Check that any overflow pipe from the safety

valve is clear, undamaged and frost-free with a 

fall to the drain.

D) Check that the product is standing firmly verti-

cally and horizontally.

4.6 Handover to end-user

4. INITIAL COMMISSIONING

THE INSTALLER MUST:

Brief the end-user on safety and maintenance 

instructions.
Brief the end-user on settings and emptying the 

product.
Hand this installation manual over to the end-

user.
Enter contact details on the type plate on the 

product.

 WARNING

The water temperature in the product may ex-

ceed 75°C and could cause scalding. Before emp-

tying, a hot tap should be opened to max. pres-

sure/temperature for min. 3 minutes.

A) Disconnect the power supply.

B) Shut off incoming cold water supply.

C)  Open  a  hot  tap  to  the  maximum

– leave open (prevents vacuum).

D) Disconnect the pipes for the cold water feed

(D) to the product. Product emptied.

Before the product is filled up again, the pipe 

for  the cold  water  supply  must be  reattached 

to  the  connection  (D)  with  a  suitable  sealant. 

Check  that  the  connection  is  tight  after  the 

product is in operation. 

Follow  the  instructions  for  the  external  heat 

source  when  emptying  this.  Then  disconnect 

the return pipe from the coil. The coil is emp-

4.5 Emptying of water

tied via the lower connection. Note: The coil has 

a riser (C) from the lowest point, where liquid is 

collected.  To  empty  the  coil  completely  com-

pressed air has to be applied to the upper coil 

connection to drain off all the liquid. 

D

C

1

Содержание 800 0325

Страница 1: ...otwater AS Industriveien 1 3300 Hokksund Norway Tel 47 32 25 00 00 Fax 47 32 25 00 90 E mail oso oso no www osohotwater com Delta Geocoil DGC 200 250 300 l EN SAFETY INFORMATION O M INFORMATION INSTAL...

Страница 2: ...Product dimensions 6 3 4 Requirements for installation location 7 3 5 Pipe installation 8 3 6 Electrical installation 10 4 Initial commissioning 12 4 1 Filling with water 12 4 2 Turning on the power...

Страница 3: ...y are accessible for fu ture reference The manufacturer assumes compli ance by the end user with the safety operating and maintenance instructions supplied and by the installer with the fit ting manua...

Страница 4: ...T be covered over the cover on the front The product shall NOT be modified or changed from its original state Children shall NOT play with the product or go near it without supervision The product sha...

Страница 5: ...lies with the relevant Directives See Declaration of Con formity at www osohotwater com for more infor mation The product complies with Directives for Low voltage LVD 2014 35 EU Electromagnetic compat...

Страница 6: ...ription 1 1 PT safety valve 2 1 Hot water heater with built in coil 3 2 Sensor slot 4 1 Thermometer 5 1 Thermostat 6 1 Heating element 7 1 Installation manual this document 8 3 Feet factory fitted All...

Страница 7: ...ain The manufacturer assumes no responsibility whatsoever if this provision is not followed The product shall be placed in a dry and permanently frost free position The product shall be placed on a fl...

Страница 8: ...d with a suitable sealant A safety valve see pt 2 3 suitable for the in stalled effect in accordance with current local regulations shall be fitted in the heating circuit not supplied Connect ion Dime...

Страница 9: ...ed in a room with a floor drain The manufacturer assumes no responsibility whatsoever if this provision is not followed The product shall be properly aligned vertically and horizontally on a floor or...

Страница 10: ...ted to point B on the thermostat C Yellow wire with green stripe Earth con nected to the terminal for the heating element hexagonal brass 3 6 Electrical installation The electrical supply to the heate...

Страница 11: ...l be replaced with cable of a quality that meets the requirements of the installation The cable must be replaced by a qualified electrician The product is equipped with a temperature sensor bracket wh...

Страница 12: ...ctions Brief the end user on settings and emptying the product Hand this installation manual over to the end user Enter contact details on the type plate on the product WARNING The water temperature i...

Страница 13: ...bottom of the product Adjust the feet individually un til the product is standing firmly vertically and horizontally 5 2 Maintenance All components of the product must be inspected annually by a perso...

Страница 14: ...ion vessel Contact auth installer The safety valve is worn or there are particles stuck between the membrane and the valve seat because the water is dirty Try to flush with water through the safety va...

Страница 15: ...t off incoming cold water supply C Empty the product of water see section 4 4 D Disconnect all pipes E The product can now be removed 8 2 Returns scheme This product is recyclable and shall be taken t...

Страница 16: ...l 47 32 25 00 00 oso oso no www osohotwater com This installation manual and all its content is protected by copyright and may be reproduced or distributed only with written consent from the manufactu...

Отзывы: