SECTION 2 - USER RESPONSIBILITIES, MACHINE PREPARATION, AND INSPECTION
3121716
2-11
SkyGuard Function Test
NOTE:
Refer to Section 4.12 for additional information on SkyGuard
operation.
From the Platform Console in an area free from obstructions:
1.
Operate the telescope out function.
2.
Activate the SkyGuard sensor:
a. SkyGuard -
Apply approximately 50 lb (222 Nm) of
force to yellow bar.
b. SkyGuard - SkyLine -
Press cable to break magnetic
connection between the cable and right bracket.
c. SkyGuard - SkyEye -
Put arm or hand in path of sensor
beam.
3.
Once the sensor has been activated, verify the following
conditions:
a.
Telescope out function stops and telescope in function
operates for a short duration.
b.
The horn sounds.
c.
If equipped with a SkyGuard beacon, the beacon illumi-
nates.
4.
Disengage the SkyGuard sensor, release controls, then recy-
cle the footswitch. Ensure normal operation is available.
NOTE:
On machines equipped with SkyLine, reattach magnetic end of
the cable to the bracket.
If SkyGuard remains activated after function reversal or cutout,
depress and hold the SkyGuard Override Switch to allow normal
use of machine functions until the sensor is disengaged.
Содержание JLG E400A Narrow
Страница 14: ...viii 3121716 LIST OF TABLES TABLE NUMBER TITLE PAGE TABLE NUMBER TITLE PAGE This Page Left Blank Intentionally ...
Страница 28: ...SECTION 1 SAFETY PRECAUTIONS 1 14 3121716 NOTES ...
Страница 40: ...SECTION 2 USER RESPONSIBILITIES MACHINE PREPARATION AND INSPECTION 2 12 3121716 NOTES ...
Страница 58: ...SECTION 3 MACHINE CONTROLS AND INDICATORS 3 18 3121716 NOTES ...
Страница 65: ...SECTION 4 MACHINE OPERATION 3121716 4 7 Figure 4 3 Grade and Side Slopes ...
Страница 76: ...SECTION 4 MACHINE OPERATION 4 18 3121716 Figure 4 5 Lifting Chart ...
Страница 77: ...SECTION 4 MACHINE OPERATION 3121716 4 19 Figure 4 6 Decal Installation Sheet 1 of 6 ...
Страница 78: ...SECTION 4 MACHINE OPERATION 4 20 3121716 Figure 4 7 Decal Installation Sheet 2 of 6 ...
Страница 79: ...SECTION 4 MACHINE OPERATION 3121716 4 21 Figure 4 8 Decal Installation Sheet 3 of 6 ...
Страница 80: ...SECTION 4 MACHINE OPERATION 4 22 3121716 Figure 4 9 Decal Installation Sheet 4 of 6 ...
Страница 81: ...SECTION 4 MACHINE OPERATION 3121716 4 23 Figure 4 10 Decal Installation Sheet 5 of 6 ...
Страница 82: ...SECTION 4 MACHINE OPERATION 4 24 3121716 Figure 4 11 Decal Installation Sheet 6 of 6 ...
Страница 94: ...SECTION 4 MACHINE OPERATION 4 36 3121716 NOTES ...
Страница 98: ...SECTION 5 EMERGENCY PROCEDURES 5 4 3121716 NOTES ...
Страница 102: ...SECTION 6 ACCESSORIES 6 4 3121716 NOTES ...
Страница 111: ...SECTION 7 GENERAL SPECIFICATIONS OPERATOR MAINTENANCE 3121716 7 9 Figure 7 2 E450 Maintenance Lubrication Diagram ...
Страница 112: ...SECTION 7 GENERAL SPECIFICATIONS OPERATOR MAINTENANCE 7 10 3121716 Figure 7 3 M450 Maintenance Lubrication Diagram ...
Страница 126: ...SECTION 8 INSPECTION AND REPAIR LOG 8 2 3121716 Table 8 1 Inspection and Repair Log Date Comments ...
Страница 127: ......