SECTION 4 - MACHINE OPERATION
4-10
– JLG Lift –
3121214
4.9
SHUT DOWN AND PARK
NOTE:
When parking battery powered units overnight, batteries
should be charged in accordance with instructions in
Section 6 to ensure readiness for following workday.
NOTE:
Electric machines are equipped with a static strap due to
static electricity build-ups. Strap is located under rear of
machine chassis.
To shut down and park the machine, the procedures are as
follows:
1.
Drive machine to a reasonably well protected area.
2.
Ensure boom is lowered over rear drive axle.
3.
Shut down Emergency Stop at Platform Controls.
4.
Shut down Emergency Stop at Ground Controls. Posi-
tion Platform/Ground Select switch to center OFF.
5.
If necessary, cover Platform Controls to protect instruc-
tion placards, warning decals and operating controls
from hostile environment.
4.10 LIFTING AND TIE DOWN
Lifting
1.
Refer to the Serial Number Tag, call JLG Industries, or
weigh the individual unit to find out the Gross Vehicle
Weight.
2.
Place the boom in the stowed position.
3.
Remove all loose items from the machine.
4.
Properly adjust the rigging to prevent damage to the
machine and so the machine remains level.
Tie Down
WHEN TRANSPORTING THE MACHINE, THE BOOM MUST BE FULLY
LOWERED INTO THE BOOM REST.
1.
Place the boom in the stowed position.
2.
Remove all loose items from the machine.
3.
Secure the chassis and the platform using straps or
chains of adequate strength.
Property of American Airlines
Содержание JLG E300A
Страница 2: ...P r o p e r t y o f A m e r i c a n A i r l i n e s...
Страница 78: ...SECTION 4 MACHINE OPERATION 4 32 JLG Lift 3121214 NOTES P r o p e r t y o f A m e r i c a n A i r l i n e s...
Страница 82: ...SECTION 5 EMERGENCY PROCEDURES 5 4 JLG Lift 3121214 NOTES P r o p e r t y o f A m e r i c a n A i r l i n e s...
Страница 99: ...P r o p e r t y o f A m e r i c a n A i r l i n e s...