
PAGE: 204
MAR 30/2020
INSTALLATION MANUAL OPERATION MANUAL
KANNAD 406 AF / AF-H / AF (6D)
© 2020 Orolia S.A.S. All rigths are strictly reserved.
B. Bracket installation
• Determine the location of the ELT on board according to FAR/RTCA
recommendations.
CAUTION: DO NOT INSTALL THE ELT IN A LOCATION DIRECTLY
EXPOSED TO THE SUN.
• Determine the axis of the ELT, according to the type of KANNAD 406:
- KANNAD 406 AF:
Refer to (1) KANNAD 406 AF installation, page 205
;
Refer to (2) KANNAD 406 AF-H installation, page
;
- KANNAD 406 AF (6D):
Refer to (3) KANNAD 406 AF (6D) installation,
• Drill 4 holes Ø 6 mm in the aircraft structure according to "Drilling mask".
Holes 4,5,6,7 shall be preferred.
• If the aircraft structure is not solid enough to withstand a 500 kg traction on
the bracket, a reinforcement plate (not supplied) should be installed as
shown
Figure 202: Bracket installation
• Fix the bracket with the 4 screws, 8 washers and 4 nylstop nuts supplied.
IMPORTANT: Tighten to a torque between 4 and 5 Newton x meter.
Figure 202: Bracket installation
Screw
Mounting bracket
Ø 6 mm holes
Aircraft structure
Washer (large)
Nylstop nut
Reinforcement plate (not supplied)
1
3
4
5
6
7
8
9
10
Flight Direction Arrow
Washer (small)
Содержание KANNAD 406 AF
Страница 59: ......